Permit: TC-MDP-0624-00694
Permit Details
Apply Date:
06/28/2024
Applicant:
Dana Petty
Description:
SFR 130.1600 T21-M0030
Permit Reviews
Permit Number - TC-MDP-0624-00694
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/01/2024 | APPROVED |
01/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/28/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00694
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Date | Description | Comments |
---|---|---|
07/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/01/2024 | Post-Tension Inspection Report is required. | |
06/03/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00694
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2024 | BULD - Electrical Clearance | N/A | Not Ready | 12/19/24 not ready, no branch circuits. |
12/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12/19/20 Electrical outlet at main entrance window is not on plans, pex tubing needs to be moved away from bucket light by laundry room. Wires on gusset plates need to be moved off of plates. Stopped inspection |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00694
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2024 | COT - RSPL - Yard Water Line | Passed | 11-14-24, main water line, sewer connection,setbacks, underground plumbing approved. Okay to backfill-provide shading. | |
11/14/2024 | COT - RSPL - Sewer | Passed | 11-14-24, main water line, sewer connection,setbacks, underground plumbing approved. Okay to backfill-provide shading. | |
11/14/2024 | COT - RSPL - Rough Soil | Passed | 11-14-24, main water line, sewer connection,setbacks, underground plumbing approved. Okay to backfill-provide shading. | |
11/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-20-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
11/20/2024 | COT - RSBU - Preslab | Passed | 11-20-24, preslab verified as per approved plans. okay to pour concrete. | |
11/20/2024 | COT - RSEL - Electrical Underground | Passed | 11-20-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
11/20/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-20-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
12/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 12-6-24, exterior clips/sheathing and roof nailing approved. | |
12/06/2024 | COT - RSBU - Roof Nailing | Passed | 12-6-24, exterior clips/sheathing and roof nailing approved. | |
12/19/2024 | COT - RSPL - Gas Pressure Test | Passed | 12/19/24 pass | |
12/23/2024 | BULD - Electrical Clearance | Passed | 12/23/24 ready for temp power 12/23/24 CLEARANCE ECO | |
12/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/23/24 corrections made | |
01/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/13/25 corrections made |