Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0623-01225
Permit Details
Apply Date:
09/08/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053
Permit Reviews
Permit Number - TC-MDP-0623-01225
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/08/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/15/2023 | APPROVED |
08/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01225
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date | Description | Comments |
---|---|---|
09/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
09/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/11/2023 | Post-Tension Inspection Report is required. | |
06/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
09/08/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01225
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 22