Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/29/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053

Permit Reviews

Permit Number - TC-MDP-0623-01224
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date Submittal Complete Date Status  
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/08/2024 APPROVED Review Details
06/30/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01224
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date Description Comments
06/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/08/2024 Post-Tension Inspection Report is required.
06/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01224
Permite Description: SFR 135.2110 T21-M0053
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/01/2024 RSBU - Building Final N/A Re-inspection required 3/1/24 waiting on engineering approval

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01224
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/07/2023 COT - RSEL - Electrical Underground Passed
09/07/2023 COT - RSPL - Yard Water Line Passed
09/07/2023 COT - RSPL - Sewer Passed
09/19/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/19/2023 COT - RSBU - Preslab Passed
09/19/2023 COT - RSEL - Grounding/Bonding Passed
09/20/2023 COT - RSPL - Backwater Valve Passed
10/10/2023 COT - RSBU - Roof Nailing Passed
10/12/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/20/2023 BULD - Electrical Clearance Passed
11/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/27/2023 COT - RSPL - Gas Pressure Test Passed
12/06/2023 COT - RSBU - Interior Shear Bracing Passed Interior shear walls are properly installed with the screw pattern being 4" on edges and 7" in the field. Okay to tape and texture all walls and ceilings.
01/31/2024 COT - BULD - SWG Clearance Passed All gas appliance locations have valves in place and sediment traps installed. Okay to connect meter and turn on gas.
02/29/2024 COT - RSEL - Outdoor Lighting Passed
02/29/2024 COT - RSPL - Rough Soil Passed
02/29/2024 RSBU - Building Progress Passed
03/01/2024 COT - RSEL - Electrical Final Passed
03/01/2024 COT - RSPL - Plumbing Final Passed
03/01/2024 COT - RSME - Mechanical Final Passed
03/06/2024 RSBU - Building Final Passed
03/28/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 33 FINAL SPECIAL INSPECTION CERT-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 33 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 33 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 33 SPECIAL INSPECTION CERTIFICATE-2023-06-29_V1.PDF DOCUMENTS VIEW