Permit: TC-MDP-0623-01222
Permit Details
Apply Date:
06/29/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053
Permit Reviews
Permit Number - TC-MDP-0623-01222
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/30/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/05/2023 | APPROVED |
02/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01222
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date | Description | Comments |
---|---|---|
06/30/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/30/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/08/2024 | Post-Tension Inspection Report is required. | |
06/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/30/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
07/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01222
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2023 | COT - RSPL - Backwater Valve | Passed | ||
09/18/2023 | COT - RSPL - Rough Soil | Passed | ||
09/18/2023 | COT - RSPL - Sewer | Passed | ||
09/18/2023 | COT - RSPL - Yard Water Line | Passed | ||
09/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/22/2023 | COT - RSBU - Preslab | Passed | ||
09/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/18/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
12/04/2023 | BULD - Electrical Clearance | Passed | Okay to energize. ECO Clearance issued. Ground wire connected to Ufer ground and gas pipeline, water line is plastic. | |
12/04/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-4-23: Mechanical and plumbing are complete. Still need plan revision for garage lighting circuit and install 12 gauge wire for all exterior outlets, including the equipment service outlet. | |
12/04/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# air pressure. Okay to proceed. | |
12/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
03/01/2024 | COT - BULD - SWG Clearance | Passed | ||
03/08/2024 | COT - RSEL - Electrical Final | Passed | ||
03/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
03/08/2024 | COT - RSME - Mechanical Final | Passed | ||
03/08/2024 | COT - RSPL - Plumbing Final | Passed | ||
03/08/2024 | RSBU - Building Final | Passed | Passed per Ernie Stevens. | |
03/08/2024 | RSBU - Building Progress | Passed | ||
03/08/2024 | ENGR Engineering Final | Passed |