Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/29/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053

Permit Reviews

Permit Number - TC-MDP-0623-01222
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date Submittal Complete Date Status  
06/30/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/05/2023 APPROVED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01222
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date Description Comments
06/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/08/2024 Post-Tension Inspection Report is required.
06/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01222
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/18/2023 COT - RSPL - Backwater Valve Passed
09/18/2023 COT - RSPL - Rough Soil Passed
09/18/2023 COT - RSPL - Sewer Passed
09/18/2023 COT - RSPL - Yard Water Line Passed
09/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/22/2023 COT - RSBU - Preslab Passed
09/22/2023 COT - RSEL - Grounding/Bonding Passed
09/22/2023 COT - RSEL - Electrical Underground Passed
10/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/18/2023 COT - RSBU - Roof Nailing Passed
12/04/2023 BULD - Electrical Clearance Passed Okay to energize. ECO Clearance issued. Ground wire connected to Ufer ground and gas pipeline, water line is plastic.
12/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-4-23: Mechanical and plumbing are complete. Still need plan revision for garage lighting circuit and install 12 gauge wire for all exterior outlets, including the equipment service outlet.
12/04/2023 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# air pressure. Okay to proceed.
12/20/2023 COT - RSBU - Interior Shear Bracing Passed
03/01/2024 COT - BULD - SWG Clearance Passed
03/08/2024 COT - RSEL - Electrical Final Passed
03/08/2024 COT - RSEL - Outdoor Lighting Passed
03/08/2024 COT - RSME - Mechanical Final Passed
03/08/2024 COT - RSPL - Plumbing Final Passed
03/08/2024 RSBU - Building Final Passed Passed per Ernie Stevens.
03/08/2024 RSBU - Building Progress Passed
03/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 31 FINAL SPECIAL INSPECTION CERT-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 31 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 31 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 31 SPECIAL INSPECTION CERTIFICATE-2023-06-29_V1.PDF DOCUMENTS VIEW