Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/08/2023
Applicant:
Daria Hopkins
Description:
SFR 135.2110 T21-M0053

Permit Reviews

Permit Number - TC-MDP-0623-01219
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Start Date Submittal Complete Date Status  
09/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/15/2023 APPROVED Review Details
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01219
Permit Status: Complete
Permit Description: SFR 135.2110 T21-M0053
Date Description Comments
09/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/11/2023 Post-Tension Inspection Report is required.
06/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01219
Permit Description: SFR 135.2110 T21-M0053
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/02/2023 COT - RSPL - Rough Soil Passed
11/07/2023 COT - RSPL - Yard Water Line Passed
11/08/2023 COT - RSPL - Sewer Passed
11/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/09/2023 COT - RSBU - Preslab Passed
11/09/2023 COT - RSEL - Electrical Underground Passed
11/09/2023 COT - RSEL - Grounding/Bonding Passed
12/01/2023 COT - RSBU - Roof Nailing Passed
12/01/2023 COT - RSBU - Exterior Clips/Sheathing Passed Anchor bolts missing right side of house.
01/26/2024 BULD - Electrical Clearance Passed
01/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/30/2024 COT - RSPL - Gas Pressure Test Passed
02/16/2024 COT - RSBU - Interior Shear Bracing Passed
04/03/2024 COT - BULD - SWG Clearance Passed
05/01/2024 COT - RSEL - Outdoor Lighting Passed
05/01/2024 RSBU - Building Progress Passed
05/01/2024 ENGR Engineering Final Passed
05/03/2024 COT - RSEL - Electrical Final Passed
05/03/2024 COT - RSME - Mechanical Final Passed
05/03/2024 COT - RSPL - Plumbing Final Passed
05/03/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
143790 PT LOT 59 COMPLETE-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 59 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 59 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 59 SPECIAL INSPECTION CERTIFICATE-2023-09-08_V1.PDF DOCUMENTS VIEW