Permit: TC-MDP-0623-01216
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
518 N GRAY SLATE DR
Address NEW:
518 N GRAY SLATE DR
Apply Date:
06/05/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079
Permit Reviews
Permit Number - TC-MDP-0623-01216
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/06/2025 | APPROVED |
| 06/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/07/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01216
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079
| Date | Description | Comments |
|---|---|---|
| 06/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/06/2024 | Post-Installed Anchor Inspection Report is required. | |
| 06/06/2024 | Post-Tension Inspection Report is required. | |
| 06/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/06/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01216
Permite Description: SFR MER1401840 T21-M0079
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | COT - RSPL - Gas Pressure Test | N/A | Canceled | 1/6/25: canceled per Brit |
| 01/06/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 1/6/25: canceled per Brit |
| 01/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | 1/6/25: canceled per Brit |
| 03/24/2025 | COT - RSEL - Electrical Final | N/A | Canceled | 3-24-25, canceled by contractor. |
| 03/24/2025 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 3-24-25, canceled by contractor. |
| 03/24/2025 | COT - RSME - Mechanical Final | N/A | Canceled | 3-24-25, canceled by contractor. |
| 03/24/2025 | COT - RSPL - Plumbing Final | N/A | Canceled | 3-24-25, canceled by contractor. |
| 03/24/2025 | RSBU - Building Final | N/A | Canceled | 3-24-25, canceled by contractor. |
| 03/24/2025 | RSBU - Building Progress | N/A | Canceled | 3-24-25, canceled by contractor. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01216
Permit Description: SFR MER1401840 T21-M0079
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2024 | COT - RSPL - Backwater Valve | Passed | 10-28-24, backwater valve inspection approved. Okay to backfill. | |
| 10/28/2024 | COT - RSPL - Rough Soil | Passed | 10-28-24, underground plumbing inspection approved. Okay to backfill. | |
| 10/28/2024 | COT - RSPL - Yard Water Line | Passed | 10-28-24, main water line inspection approved. Okay to backfill. | |
| 10/28/2024 | COT - RSPL - Sewer | Passed | 10-28-24, sewer connection inspection approved. Okay to backfill. | |
| 11/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/01/2024 | COT - RSBU - Preslab | Passed | ||
| 11/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 11/01/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | pass | |
| 11/13/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 01/07/2025 | COT - RSPL - Gas Pressure Test | Passed | 1/7/25 held pressure | |
| 01/09/2025 | BULD - Electrical Clearance | Passed | 1-9-25, panel okay to be energized. ECO clearance issued to TEP. | |
| 01/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-9-25, corrections from previous inspection have been made. Okay to continue construction. | |
| 01/27/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/27/25: Drywall is properly secured to studs per plan requirements for interior shear walls. Okay to proceed with tape, texture, and paint. | |
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 3-19-25, okay for SWG to install meter. Clearance issued. | |
| 03/24/2025 | ENGR Engineering Final | Passed | ||
| 03/27/2025 | COT - RSEL - Electrical Final | Passed | 3-27-25, plumbing, mechanical, outdoor lighting, electrical, and building finals approved. | |
| 03/27/2025 | COT - RSEL - Outdoor Lighting | Passed | 3-27-25, plumbing, mechanical, outdoor lighting, electrical, and building finals approved. | |
| 03/27/2025 | COT - RSME - Mechanical Final | Passed | 3-27-25, plumbing, mechanical, outdoor lighting, electrical, and building finals approved. | |
| 03/27/2025 | COT - RSPL - Plumbing Final | Passed | 3-27-25, plumbing, mechanical, outdoor lighting, electrical, and building finals approved. | |
| 03/27/2025 | RSBU - Building Final | Passed | 3-27-25, plumbing, mechanical, outdoor lighting, electrical, and building finals approved. | |
| 03/27/2025 | RSBU - Building Progress | Passed |