Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
08/23/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079

Permit Reviews

Permit Number - TC-MDP-0623-01212
Permit Status: Issued
Permit Description: SFR MER1401840 T21-M0079
Start Date Submittal Complete Date Status  
08/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/28/2024 APPROVED Review Details
01/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01212
Permit Status: Issued
Permit Description: SFR MER1401840 T21-M0079
Date Description Comments
08/28/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/28/2024 Post-Tension Inspection Report is required.
06/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/06/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0623-01212
Permit Description: SFR MER1401840 T21-M0079
Total Completed Inspections - 13
Date Description Inspector Results Comments
10/30/2024 COT - RSPL - Yard Water Line Passed Water line is connected to city main water supply and metered. Line is under street pressure. Okay to shade pipe and backfill trench.
10/30/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line with tracer wire installed. Okay to shade pipes and backfill trenches.
10/30/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line with tracer wire installed. Okay to shade pipes and backfill trenches.
11/07/2024 COT - RSBU - Preslab Passed 11/7/24 pass
11/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11/7/24 pass
11/07/2024 COT - RSEL - Electrical Underground Passed 11/7/24 pass
11/25/2024 COT - RSBU - Exterior Clips/Sheathing Passed
11/25/2024 COT - RSBU - Roof Nailing Passed
01/09/2025 BULD - Electrical Clearance Passed 1-9-25, panel okay to be energized. ECO clearance issued to TEP
01/09/2025 COT - RSEL - Grounding/Bonding Passed 1-9-25, grounding/bonding approved.
01/09/2025 COT - RSPL - Gas Pressure Test Passed 1-9-25, gas pressure test approved.
01/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 01/10/25
Receptacle added.
01/28/2025 COT - RSBU - Interior Shear Bracing Passed 1-28-25, approved. Okay to tape & texture drywall.

Documents

File Name Document Type  
151482 PT LOT 40 COMPLETE-2024-12-31_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 40 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 40 SPECIAL INSPECTION CERTIFICATE-2024-08-23_V1.PDF DOCUMENTS VIEW