Permit: TC-MDP-0623-01211
Permit Details
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1401840 T21-M0079
Permit Reviews
Permit Number - TC-MDP-0623-01211
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/17/2024 | APPROVED |
10/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2024 | APPROVED |
01/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/11/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01211
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079
Date | Description | Comments |
---|---|---|
01/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/11/2024 | Post-Tension Inspection Report is required. | |
06/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01211
Permite Description: SFR MER1401840 T21-M0079
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/01/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01211
Permit Description: SFR MER1401840 T21-M0079
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/18/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line and under a water pressure test with no leaks in pipes or connectors. Okay to shade pipes and backfill trenches. | |
03/18/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to city water main and fully operational. Okay to shade pipe and backfill trench. | |
03/18/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line and under a water pressure test with no leaks in pipes or connectors. Okay to shade pipes and backfill trenches. | |
04/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/03/2024 | COT - RSBU - Preslab | Passed | ||
04/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/15/2024 | COT - RSBU - Roof Nailing | Passed | ||
04/15/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/07/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
05/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly installed and secured to the studs per the plans. Okay to proceed with tape, texture, and painting of walls and ceilings. | |
06/27/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/23/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter connection | |
07/26/2024 | COT - RSEL - Electrical Final | Passed | ||
07/26/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
07/26/2024 | COT - RSME - Mechanical Final | Passed | ||
07/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
07/26/2024 | RSBU - Building Final | Passed | ||
07/26/2024 | RSBU - Building Progress | Passed | ||
08/14/2024 | ENGR Engineering Final | Passed |