Permit: TC-MDP-0623-01204
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12818 E TORTOISE CANYON LN
Address NEW:
12818 E TORTOISE CANYON LN
Apply Date:
06/29/2023
Applicant:
Description:
SFR F40J22 T22-M0022 revision truss calcs
Permit Reviews
Permit Number - TC-MDP-0623-01204
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/30/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/05/2023 | APPROVED |
| 03/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01204
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
| Date | Description | Comments |
|---|---|---|
| 06/30/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/30/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/11/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/30/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 01/18/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01204
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 08/10/2023 | COT - RSPL - Sewer | Passed | ||
| 08/10/2023 | COT - RSPL - Rough Soil | Passed | ||
| 08/10/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 08/24/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/24/2023 | COT - RSBU - Preslab | Passed | ||
| 08/24/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 08/24/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/03/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/3/23 Anchor bolt's missing marked in red X will check at intermediate | |
| 10/03/2023 | COT - RSBU - Roof Nailing | Passed | 10/3/23 Three trusses in kitchen need secured, will check at intermediate | |
| 11/28/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 11/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/30/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/22/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/26/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 03/11/2024 | COT - RSEL - Electrical Final | Passed | All electrical fixtures are installed and operational, cover plates are properly secured, GFCI outlets are in kitchen, bathrooms, and garage. Electrical panel is properly labeled and AFCI breakers are installed for bedroom circuits. | |
| 03/11/2024 | COT - RSEL - Outdoor Lighting | Passed | All exterior lights are installed per plans and fully functional. | |
| 03/11/2024 | COT - RSME - Mechanical Final | Passed | All mechanical equipment is installed and operational, registers for supply and return air are in place, and all interior doors are cut to allow air flow. | |
| 03/11/2024 | COT - RSPL - Plumbing Final | Passed | All plumbing fixtures are installed and functional. | |
| 03/19/2024 | RSBU - Building Final | Passed | ||
| 03/19/2024 | RSBU - Building Progress | Passed | ||
| 03/19/2024 | ENGR Engineering Final | Passed |