Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/29/2023
Applicant:
Description:
SFR F40J22 T22-M0022 revision truss calcs

Permit Reviews

Permit Number - TC-MDP-0623-01204
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Start Date Submittal Complete Date Status  
06/30/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/05/2023 APPROVED Review Details
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01204
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Date Description Comments
06/30/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/11/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01204
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/10/2023 COT - RSPL - Yard Water Line Passed
08/10/2023 COT - RSPL - Sewer Passed
08/10/2023 COT - RSPL - Rough Soil Passed
08/10/2023 COT - RSPL - Backwater Valve Passed
08/24/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/24/2023 COT - RSBU - Preslab Passed
08/24/2023 COT - RSEL - Electrical Underground Passed
08/24/2023 COT - RSEL - Grounding/Bonding Passed
10/03/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10/3/23 Anchor bolt's missing marked in red X will check at intermediate
10/03/2023 COT - RSBU - Roof Nailing Passed 10/3/23 Three trusses in kitchen need secured, will check at intermediate
11/28/2023 BULD - Electrical Clearance Passed TEP ECO
11/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/30/2023 COT - RSPL - Gas Pressure Test Passed
12/22/2023 COT - RSBU - Interior Shear Bracing Passed
02/26/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/11/2024 COT - RSEL - Electrical Final Passed All electrical fixtures are installed and operational, cover plates are properly secured, GFCI outlets are in kitchen, bathrooms, and garage. Electrical panel is properly labeled and AFCI breakers are installed for bedroom circuits.
03/11/2024 COT - RSEL - Outdoor Lighting Passed All exterior lights are installed per plans and fully functional.
03/11/2024 COT - RSME - Mechanical Final Passed All mechanical equipment is installed and operational, registers for supply and return air are in place, and all interior doors are cut to allow air flow.
03/11/2024 COT - RSPL - Plumbing Final Passed All plumbing fixtures are installed and functional.
03/19/2024 RSBU - Building Final Passed
03/19/2024 RSBU - Building Progress Passed
03/19/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-29_V1.PDF DOCUMENTS VIEW