Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/29/2023
Applicant:
Andrea Flood
Description:
SFR F40J22 T22-M0022 revision truss calcs

Permit Reviews

Permit Number - TC-MDP-0623-01203
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Start Date Submittal Complete Date Status  
06/30/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/05/2023 APPROVED Review Details
10/24/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01203
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Date Description Comments
06/30/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/30/2023 Post-Tension Inspection Report is required.
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/30/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01203
Permit Description: SFR F40J22 T22-M0022 revision truss calcs
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/07/2023 COT - RSPL - Sewer Passed
08/07/2023 COT - RSPL - Yard Water Line Passed
08/07/2023 COT - RSPL - Rough Soil Passed
08/10/2023 COT - RSBU - Preslab Passed
08/10/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/10/2023 COT - RSEL - Electrical Underground Passed
09/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/18/2023 COT - RSBU - Roof Nailing Passed
10/20/2023 BULD - Electrical Clearance Passed
10/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/20/2023 COT - RSEL - Grounding/Bonding Passed
10/20/2023 COT - RSPL - Gas Pressure Test Passed
12/01/2023 COT - RSBU - Interior Shear Bracing Passed
02/01/2024 COT - BULD - SWG Clearance Passed SWG for meter only
02/09/2024 COT - RSEL - Electrical Final Passed
02/09/2024 COT - RSEL - Outdoor Lighting Passed
02/09/2024 COT - RSME - Mechanical Final Passed
02/09/2024 COT - RSPL - Plumbing Final Passed
02/09/2024 RSBU - Building Final Passed 2/9/24: waiting on engineering final
02/09/2024 RSBU - Building Progress Passed
02/09/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152455 SAGUARO TRAILS PT REPORT LOT 3295-2023-10-23_V1.PDF DOCUMENTS VIEW
SPAPP-P20WP00249 FINAL ACCEPTANCE-2023-10-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-29_V1.PDF DOCUMENTS VIEW
SPAPP-1_ST SEWER ACCEPTANCE LETTER-2023-06-29_V1.PDF DOCUMENTS VIEW