Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
2395 W OWL PERCH LP
Apply Date:
08/14/2023
Applicant:
Description:
SFR K35L T21-M0035

Permit Reviews

Permit Number - TC-MDP-0623-01200
Permit Status: Complete
Permit Description: SFR K35L T21-M0035
Start Date Submittal Complete Date Status  
11/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/21/2023 APPROVED Review Details
08/15/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01200
Permit Status: Complete
Permit Description: SFR K35L T21-M0035
Date Description Comments
08/15/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/16/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
08/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01200
Permit Description: SFR K35L T21-M0035
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/26/2023 COT - RSPL - Rough Soil Passed Approved. Okay to back fill shading required. 9/26/2023
09/26/2023 COT - RSPL - Backwater Valve Passed Approved. Okay to back fill shading required. 9/26/2023
09/26/2023 COT - RSPL - Sewer Passed Approved. Okay to back fill shading required. 9/26/2023
09/26/2023 COT - RSPL - Yard Water Line Passed Approved. Okay to back fill shading required. 9/26/2023
10/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/03/2023 COT - RSBU - Preslab Passed
10/03/2023 COT - RSEL - Electrical Underground Passed
10/03/2023 COT - RSEL - Grounding/Bonding Passed
10/23/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/23/2023 COT - RSBU - Roof Nailing Passed
11/21/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 11/21/2023
11/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/21/2023 COT - RSPL - Gas Pressure Test Passed
12/08/2023 COT - RSBU - Interior Shear Bracing Passed
01/31/2024 COT - BULD - SWG Clearance Passed Clearance for SOUTHWEST GAS. 1/31/2024
02/28/2024 COT - RSEL - Electrical Final Passed
02/28/2024 COT - RSEL - Outdoor Lighting Passed
02/28/2024 COT - RSME - Mechanical Final Passed
02/28/2024 COT - RSPL - Plumbing Final Passed
02/28/2024 RSBU - Building Progress Passed
02/28/2024 RSBU - Building Final Passed
02/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
210841 - WESTBRIDGE AT SILVERBELL LOT 79 - PT REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-14_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-14_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-14_V1.PDF DOCUMENTS VIEW