Permit: TC-MDP-0623-01200
Permit Details
Apply Date:
08/14/2023
Applicant:
David Martin
Description:
SFR K35L T21-M0035
Permit Reviews
Permit Number - TC-MDP-0623-01200
Permit Status: Complete
Permit Description: SFR K35L T21-M0035
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/21/2023 | APPROVED |
08/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/17/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01200
Permit Status: Complete
Permit Description: SFR K35L T21-M0035
Date | Description | Comments |
---|---|---|
08/15/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/16/2023 | Post-Tension Inspection Report is required. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County | |
08/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01200
Permit Description: SFR K35L T21-M0035
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to back fill shading required. 9/26/2023 | |
09/26/2023 | COT - RSPL - Backwater Valve | Passed | Approved. Okay to back fill shading required. 9/26/2023 | |
09/26/2023 | COT - RSPL - Sewer | Passed | Approved. Okay to back fill shading required. 9/26/2023 | |
09/26/2023 | COT - RSPL - Yard Water Line | Passed | Approved. Okay to back fill shading required. 9/26/2023 | |
10/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/03/2023 | COT - RSBU - Preslab | Passed | ||
10/03/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/03/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/23/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/23/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/21/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 11/21/2023 | |
11/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/21/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
12/08/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/31/2024 | COT - BULD - SWG Clearance | Passed | Clearance for SOUTHWEST GAS. 1/31/2024 | |
02/28/2024 | COT - RSEL - Electrical Final | Passed | ||
02/28/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/28/2024 | COT - RSME - Mechanical Final | Passed | ||
02/28/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/28/2024 | RSBU - Building Progress | Passed | ||
02/28/2024 | RSBU - Building Final | Passed | ||
02/29/2024 | ENGR Engineering Final | Passed |