Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/27/2023
Applicant:
David Martin
Description:
SFR K35G T21-M0033

Permit Reviews

Permit Number - TC-MDP-0623-01195
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Start Date Submittal Complete Date Status  
07/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/31/2023 APPROVED Review Details
10/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01195
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Total Outstanding Activity Conditions - 1
Date Name
07/31/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0623-01195
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Date Description Comments
07/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/30/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01195
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/22/2023 COT - RSPL - Rough Soil Passed
08/22/2023 COT - RSPL - Sewer Passed
08/22/2023 COT - RSPL - Yard Water Line Passed
08/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/29/2023 COT - RSBU - Preslab Passed
08/29/2023 COT - RSEL - Electrical Underground Passed
08/29/2023 COT - RSEL - Grounding/Bonding Passed
09/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/22/2023 COT - RSBU - Roof Nailing Passed
10/25/2023 BULD - Electrical Clearance Passed TEP ECO
10/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/25/2023 COT - RSPL - Gas Pressure Test Passed
11/06/2023 COT - RSBU - Interior Shear Bracing Passed
01/05/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 1/5/2024
01/19/2024 COT - RSEL - Electrical Final Passed
01/18/2024 COT - RSEL - Outdoor Lighting Passed
01/18/2024 COT - RSME - Mechanical Final Passed
01/18/2024 COT - RSPL - Plumbing Final Passed
01/18/2024 RSBU - Building Final Passed
01/18/2024 RSBU - Building Progress Passed
01/18/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
210841 - WESTBRIDGE AT SILVERBELL LOT 2 - PT REPORT-2023-10-24_V1.PDF DOCUMENTS VIEW
SPAPP-P22WP00025 FINAL ACCEPTANCE LETTER-2023-10-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-07-27_V1.PDF DOCUMENTS VIEW