Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/05/2023
Applicant:
David Martin
Description:
SFR K35G T21-M0033

Permit Reviews

Permit Number - TC-MDP-0623-01194
Permit Status: Complete
Permit Description: SFR K35G T21-M0033
Start Date Submittal Complete Date Status  
07/05/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/06/2023 APPROVED Review Details
10/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01194
Permit Status: Complete
Permit Description: SFR K35G T21-M0033
Date Description Comments
07/05/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/05/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/09/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
07/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01194
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/01/2023 COT - RSPL - Yard Water Line Passed
08/02/2023 RSPL - Plumbing Progress Passed Yard water line from home to meter location, okay to shade cover
08/02/2023 COT - RSPL - Rough Soil Passed
08/02/2023 COT - RSPL - Sewer Passed
08/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 8/9/2023 Approved rebar per plan. Okay for concrete placement in footing and slab.
08/09/2023 COT - RSBU - Preslab Passed 8/9/2023 Approved rebar per plan. Okay for concrete placement in footing and slab.
08/09/2023 COT - RSEL - Electrical Underground Passed
08/09/2023 COT - RSEL - Grounding/Bonding Passed
08/29/2023 COT - RSBU - Exterior Clips/Sheathing Passed
08/29/2023 COT - RSBU - Roof Nailing Passed
10/03/2023 BULD - Electrical Clearance Passed TEP ECO
10/03/2023 COT - RSPL - Gas Pressure Test Passed
10/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/5/23: ok to proceed
10/10/2023 COT - RSBU - Interior Shear Bracing Passed
11/22/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 11/22/2023
12/13/2023 COT - RSEL - Electrical Final Passed
12/13/2023 COT - RSEL - Outdoor Lighting Passed
12/13/2023 COT - RSME - Mechanical Final Passed
12/13/2023 COT - RSPL - Plumbing Final Passed
12/13/2023 RSBU - Building Final Passed
12/13/2023 RSBU - Building Progress Passed
12/13/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
210841 WESTBRIDGE AT SILVERBELL LOT 24 PT REPORT-2023-10-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-07-05_V1.PDF DOCUMENTS VIEW