Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
07/26/2023
Applicant:
Andrea Flood
Description:
SFR F40F22 T22-M0026

Permit Reviews

Permit Number - TC-MDP-0623-01193
Permit Status: Issued
Permit Description: SFR F40F22 T22-M0026
Start Date Submittal Complete Date Status  
07/27/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/28/2023 APPROVED Review Details
10/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/23/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01193
Permit Status: Issued
Permit Description: SFR F40F22 T22-M0026
Date Description Comments
07/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/27/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/27/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/23/2023 Post-Tension Inspection Report is required.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/27/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0623-01193
Permite Description: SFR F40F22 T22-M0026
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/13/23: fresh air to close to VTR
10/13/2023 BULD - Electrical Clearance N/A Re-inspection required 10/13/23: missing breakers and receptacle
02/09/2024 RSBU - Building Final N/A Re-inspection required 2/9/24: main panel missing breakers. Empty slots on dead front need to be filled. Exterior pvc needs to be painted. Cut grey water clean out to grade. Waiting on engineering final

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0623-01193
Permit Description: SFR F40F22 T22-M0026
Total Completed Inspections - 20

Documents

File Name Document Type  
CONS-152455 SAGUARO TRAIL PT REPORT LOT 4358_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-07-26_V1.PDF DOCUMENTS VIEW