Permit: TC-MDP-0623-01188
Permit Details
Apply Date:
08/15/2023
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0623-01188
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/17/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0623-01188
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/15/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
08/15/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/15/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
08/16/2023 | Post-Tension Inspection Report is required. |
08/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0623-01188
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date | Description | Comments |
---|---|---|
06/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01188
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2023 | COT - RSPL - Rough Soil | Passed | ||
09/26/2023 | COT - RSPL - Sewer | Passed | ||
10/04/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/04/2023 | COT - RSBU - Preslab | Passed | ||
10/04/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/04/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/21/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/21/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
11/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/30/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
12/13/2023 | COT - RSPL - Yard Water Line | Passed | ||
12/13/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/28/2024 | COT - BULD - SWG Clearance | Passed | ||
03/20/2024 | ENGR Engineering Final | Passed | ||
03/25/2024 | COT - RSEL - Electrical Final | Passed | 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles. | |
03/25/2024 | COT - RSEL - Outdoor Lighting | Passed | 3/25/24: Outdoor lighting is installed per plans and fully functional. | |
03/25/2024 | COT - RSME - Mechanical Final | Passed | 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles. | |
03/25/2024 | COT - RSPL - Plumbing Final | Passed | 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles. | |
03/25/2024 | RSBU - Building Final | Passed | 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles. | |
03/25/2024 | RSBU - Building Progress | Passed | 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles. |