Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/07/2023
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs

Permit Reviews

Permit Number - TC-MDP-0623-01186
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date Submittal Complete Date Status  
08/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/09/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01186
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Activity Conditions - 6
Date Name
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/08/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/08/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0623-01186
Permit Status: Inspections complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date Description Comments
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01186
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/14/2023 COT - RSPL - Rough Soil Passed
09/14/2023 COT - RSPL - Sewer Passed
09/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/21/2023 COT - RSBU - Preslab Passed
09/21/2023 COT - RSEL - Electrical Underground Passed
09/21/2023 COT - RSEL - Grounding/Bonding Passed
10/11/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/11/2023 COT - RSBU - Roof Nailing Passed
11/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/29/2023 COT - RSPL - Gas Pressure Test Passed
11/29/2023 BULD - Electrical Clearance Passed TEP ECO
11/29/2023 RSBU - Building Progress Passed
01/03/2024 COT - RSBU - Interior Shear Bracing Passed
02/14/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/25/2024 COT - RSEL - Electrical Final Passed 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles.
03/25/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plans and fully functional.
03/25/2024 COT - RSME - Mechanical Final Passed 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles.
03/25/2024 COT - RSPL - Plumbing Final Passed 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles.
03/25/2024 COT - RSPL - Yard Water Line Passed Main water line is connected to city water with meter. All plumbing fixtures are installed and fully functional.
03/25/2024 RSBU - Building Final Passed 3/25/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, plumbing fixtures are installed and operational. Electrical panel is properly labeled. AFCI & GFCI breakers are installed and operational for bedrooms, bathrooms, kitchen, garage, and outdoor receptacles.
03/25/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-07_V1.PDF DOCUMENTS VIEW