Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/23/2023
Applicant:
Andrea Flood
Description:
SFR F40G22 T22-M0025 Revision-Truss Calcs

Permit Reviews

Permit Number - TC-MDP-0623-01184
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Start Date Submittal Complete Date Status  
09/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2023 APPROVED Review Details
06/27/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/28/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01184
Permit Status: Complete
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Date Description Comments
06/27/2023 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
06/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/27/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/27/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/02/2023 Post-Tension Inspection Report is required.
06/27/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/27/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/27/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/27/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01184
Permite Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/28/2023 COT - RSBU - Exterior Clips/Sheathing N/A Partial Pass Shear wall and back of house missing anchor bolts, remove nails from h2.5 clips on all load bearing walls to allow deflection.
COT - RSPL - Gas Pressure Test N/A Requested

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01184
Permit Description: SFR F40G22 T22-M0025 Revision-Truss Calcs
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/26/2023 COT - RSPL - Sewer Passed
07/26/2023 COT - RSPL - Rough Soil Passed
08/01/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/01/2023 COT - RSBU - Preslab Passed
08/01/2023 COT - RSEL - Electrical Underground Passed
08/01/2023 COT - RSEL - Grounding/Bonding Passed
08/28/2023 COT - RSBU - Roof Nailing Passed
08/28/2023 COT - RSPL - Backwater Valve Passed
09/25/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/25/2023 BULD - Electrical Clearance Passed TEP ECO
10/20/2023 COT - RSBU - Interior Shear Bracing Passed
10/20/2023 COT - RSPL - Yard Water Line Passed
12/06/2023 COT - BULD - SWG Clearance Passed SWG clearance issued.
01/08/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 COT - RSEL - Outdoor Lighting Passed Exterior lights match was called out on plans and are fully operational.
01/08/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 RSBU - Building Progress Passed 1-8-24: Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled.
01/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152455 SAGUARO TRAILS PT REPORT LOT 3296-2023-09-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SPAPP-1_ST SEWER ACCEPTANCE LETTER-2023-06-27_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-27_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW