Permit: TC-MDP-0623-01183
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1302 S SAN JACINTO DR UNIT 1
Address NEW:
1302 S SAN JACINTO DR UNIT 1
Apply Date:
06/23/2023
Applicant:
david evans
Description:
SWDUPLEXM SUNSET MODEL DUPLEX 3-2 PREVIOUSLY APPROVED MODEL T20-00004
Permit Reviews
Permit Number - TC-MDP-0623-01183
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 07/11/2023 | APPROVED |
| 06/27/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/29/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0623-01183
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
| Date | Description | Comments |
|---|---|---|
| 07/07/2023 | Please contact Pima County Addressing for a second address prior to issuance. Lot split has been done but parcels have not been separated yet. Addressing@pima.gov or 520-724-9512 | |
| 06/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01183
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2023 | COT - RSPL - Rough Soil | Passed | ||
| 07/21/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/21/2023 | COT - RSBU - Preslab | Passed | ||
| 07/21/2023 | COT - RSPL - Sewer | Passed | ||
| 07/28/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/28/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/03/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/09/2023 | BULD - Electrical Clearance | Passed | Approved duplex service entrance, ECO Clearance to TEP is required for construction power at unit #1 and unit #2 | |
| 12/28/2023 | COT - RSPL - Yard Water Line | Passed | pass. Okay to backfill water lines for both units. Shading is required. 12/28/2023 | |
| 01/26/2024 | COT - RSEL - Electrical Final | Passed | ||
| 01/26/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 01/26/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/26/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/26/2024 | COT - RSME - Mechanical Final | Passed | ||
| 01/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 01/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 01/26/2024 | RSBU - Building Final | Passed | 1/26/24 spoke to TDOT okay to remove hold 1:44pm \ Partial pending hold on permit. 1/26/24 | |
| 01/26/2024 | RSBU - Building Progress | Passed | ||
| 01/26/2024 | COT - BULD - SWG Clearance | Passed | ||
| 01/26/2024 | ENGR Engineering Final | Passed | Address # to be added today and Carlos will send me a picture when completed. |