Permit: TC-MDP-0623-01182
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1310 S SAN JACINTO DR UNIT 1
Address NEW:
1310 S SAN JACINTO DR UNIT 1
Apply Date:
06/23/2023
Applicant:
Jose Quintero
Description:
SWDUPLEXM SUNSET MODEL DUPLEX 3-2 PREVIOUSLY APPROVED MODEL T20-00004
Permit Reviews
Permit Number - TC-MDP-0623-01182
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/29/2023 | REQUIRES RESUBMIT |
| 07/07/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 07/11/2023 | APPROVED |
| 07/11/2023 | RESTAMP - RESIDENTIAL v.1 | 07/12/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01182
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
| Date | Description | Comments |
|---|---|---|
| 07/07/2023 | Please contact Pima County Addressing for a second address prior to issuance. Lot split has been done but parcels have not been seperated yet. Addressing@pima.gov or 520-724-9512 | |
| 06/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01182
Permite Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 01/30/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 01/30/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 01/30/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1/30/24: Arc-fault required at dining room both units , GFCI at laundry room missing both units , GFCI under Sink missing, 2-bedroom unit has no power to exhaust fan or lights, UV coat all exterior piping both units, secure electrical whip for water heater both units. |
| 01/30/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 1/30/24: Arc-fault required at dining room both units , GFCI at laundry room missing both units , GFCI under Sink missing, 2-bedroom unit has no power to exhaust fan or lights, UV coat all exterior piping both units, secure electrical whip for water heater both units. |
| 01/30/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 1/30/24: Arc-fault required at dining room both units , GFCI at laundry room missing both units , GFCI under Sink missing, 2-bedroom unit has no power to exhaust fan or lights, UV coat all exterior piping both units, secure electrical whip for water heater both units. |
| 02/07/2024 | ENGR Engineering Final | N/A | Partial Pass | Drainage issue in the front of the house in between the 2 units needs to be addressed. lot is holding water and not draining properly. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01182
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2
PREVIOUSLY APPROVED
MODEL T20-00004
Total Completed Inspections - 18