Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
06/27/2022
Applicant:
Celina Rodriguez
Description:
SFR BT2010-30 T22-M0010

Permit Reviews

Permit Number - TC-MDP-0623-01172
Permit Status: Issued
Permit Description: SFR BT2010-30 T22-M0010
Start Date Submittal Complete Date Status  
06/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01172
Permit Status: Issued
Permit Description: SFR BT2010-30 T22-M0010
Total Outstanding Activity Conditions - 4
Date Name
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0623-01172
Permit Status: Issued
Permit Description: SFR BT2010-30 T22-M0010
Date Description Comments
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/28/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0623-01172
Permit Description: SFR BT2010-30 T22-M0010
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/13/2023 COT - RSPL - Yard Water Line Passed
07/13/2023 COT - RSPL - Sewer Passed
07/13/2023 COT - RSPL - Rough Soil Passed
07/20/2023 COT - RSEL - Electrical Underground Passed
07/20/2023 COT - RSEL - Grounding/Bonding Passed
07/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/20/2023 COT - RSBU - Preslab Passed
08/08/2023 COT - RSBU - Roof Nailing Passed
08/17/2023 COT - RSBU - Exterior Clips/Sheathing Passed 8/8/23 two straps in garage not nailed on shear walls one baring truss on garage red tag off not supported

8/17/23 engineer stamp approved letter
09/12/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/12/2023 COT - RSPL - Gas Pressure Test Passed
10/03/2023 COT - RSBU - Interior Shear Bracing Passed
11/14/2023 BULD - Electrical Clearance Passed 11/14/23: TEP ECO
11/14/2023 COT - BULD - SWG Clearance Passed 11/14/23: SWG clearance issued.
12/14/2023 COT - RSEL - Electrical Final Passed
12/14/2023 COT - RSEL - Outdoor Lighting Passed
12/14/2023 COT - RSME - Mechanical Final Passed
12/14/2023 COT - RSPL - Plumbing Final Passed
12/14/2023 RSBU - Building Final Passed
12/20/2023 RSBU - Building Progress Passed
12/14/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA - LOT 65 START_V1.PDF DOCUMENTS VIEW
BELLA TIERRA II 65 SIC-2023-06-27_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW