Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/12/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065

Permit Reviews

Permit Number - TC-MDP-0623-01150
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date Submittal Complete Date Status  
08/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/30/2024 APPROVED Review Details
07/13/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01150
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date Description Comments
07/13/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/30/2024 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01150
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
12/04/2023 COT - RSPL - Gas Pressure Test N/A Not Ready Cancelled per John.
12/4/23: not ready
01/16/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 1/16/24: Drywall was installed without passing residential intermediate. Drywall will need to be removed in order for re-inspection to take place of residential intermediate.
12/04/2023 BULD - Electrical Clearance N/A Not Ready Cancelled per John.
12/4/23: not ready
12/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready Cancelled per John.
12/4/23: not ready
03/19/2024 COT - RSEL - Electrical Final N/A Re-inspection required Complete tile roofing. Relocate disconnect for condenser unit. Paint all exterior black pipes. Secure dishwasher and complete plumbing connection. 3/19/2024
03/19/2024 COT - RSME - Mechanical Final N/A Re-inspection required Complete tile roofing. Relocate disconnect for condenser unit. Paint all exterior black pipes. Secure dishwasher and complete plumbing connection. 3/19/2024
03/19/2024 COT - RSPL - Plumbing Final N/A Re-inspection required Complete tile roofing. Relocate disconnect for condenser unit. Paint all exterior black pipes. Secure dishwasher and complete plumbing connection. 3/19/2024
03/19/2024 RSBU - Building Final N/A Re-inspection required Complete tile roofing. Relocate disconnect for condenser unit. Paint all exterior black pipes. Secure dishwasher and complete plumbing connection. 3/19/2024

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01150
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/19/2023 COT - RSPL - Rough Soil Passed
09/19/2023 COT - RSPL - Sewer Passed
09/19/2023 COT - RSPL - Yard Water Line Passed
09/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/26/2023 COT - RSBU - Preslab Passed
09/26/2023 COT - RSEL - Electrical Underground Passed
09/26/2023 COT - RSEL - Grounding/Bonding Passed
10/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/18/2023 COT - RSBU - Roof Nailing Passed
12/05/2023 COT - RSPL - Gas Pressure Test Passed
01/18/2024 COT - RSBU - Interior Shear Bracing Passed
01/18/2024 BULD - Electrical Clearance Passed
02/27/2024 COT - BULD - SWG Clearance Passed
03/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/19/2024 COT - RSEL - Outdoor Lighting Passed
03/19/2024 RSBU - Building Progress Passed
03/19/2024 ENGR Engineering Final Passed Will have (small) unloaded roof tile pile in back yard removed in the next few days.
04/02/2024 COT - RSEL - Electrical Final Passed
04/02/2024 COT - RSME - Mechanical Final Passed
04/02/2024 COT - RSPL - Plumbing Final Passed
04/02/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 52 FINAL SPECIAL INSPECTION CERTIFICATE-2024-08-29_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 52 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 52 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 52 SPECIAL INSPECTION CERTIFICATE-2023-07-12_V1.PDF DOCUMENTS VIEW