Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065

Permit Reviews

Permit Number - TC-MDP-0623-01147
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date Submittal Complete Date Status  
08/11/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/15/2023 APPROVED Review Details
10/21/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/22/2024 APPROVED Review Details
10/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01147
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date Description Comments
10/02/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/11/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/11/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/14/2023 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/11/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01147
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/22/2024 BULD - Electrical Clearance N/A Not Ready 3/22/24: not ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01147
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/31/2023 COT - RSPL - Rough Soil Passed
10/31/2023 COT - RSPL - Sewer Passed
11/08/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
11/08/2023 COT - RSEL - Electrical Underground Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
11/08/2023 COT - RSEL - Grounding/Bonding Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
11/08/2023 COT - RSBU - Preslab Passed Rebar reinforcement is in place per plans, post tension cabling is installed and properly supported off of ground, Ufer ground is in place and the proper length, underground electrical for kitchen island is properly installed, plumbing pipes are properly wrapped with styrofoam sheeting, and subsoil is properly compacted. Okay to pour concrete for slab on grade.
12/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed All exterior shear walls are properly secured to concrete floor with bolts or Simpson hold downs. All rafters and floor joists have H2.5 clips attached to rafters/trusses and wall top plate. Okay to proceed with dry-in of walls and roof.
12/06/2023 COT - RSBU - Roof Nailing Passed All exterior shear walls are properly secured to concrete floor with bolts or Simpson hold downs. All rafters and floor joists have H2.5 clips attached to rafters/trusses and wall top plate. Okay to proceed with dry-in of walls and roof.
12/08/2023 COT - RSPL - Yard Water Line Passed
01/25/2024 COT - RSPL - Gas Pressure Test Passed
01/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/12/2024 COT - RSBU - Interior Shear Bracing Passed
04/02/2024 BULD - Electrical Clearance Passed 3/22/24: not ready
4/2/24: ECO
04/12/2024 COT - BULD - SWG Clearance Passed
05/16/2024 COT - RSEL - Outdoor Lighting Passed
05/16/2024 ENGR Engineering Final Passed
05/16/2024 RSBU - Building Progress Passed
05/22/2024 COT - RSEL - Electrical Final Passed
05/22/2024 COT - RSME - Mechanical Final Passed
05/22/2024 COT - RSPL - Plumbing Final Passed
05/22/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
143754 PT LOT 68 COMPLETE-2024-10-16_V1.PDF DOCUMENTS VIEW
LOT 68 SPECIAL INSPECTION CERTIFICATE-2023-09-29_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 68 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 68 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 68 SPECIAL INSPECTION CERTIFICATE-2023-08-10_V1.PDF DOCUMENTS VIEW