Permit: TC-MDP-0623-01146
Permit Details
Apply Date:
06/09/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0623-01146
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/09/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/12/2023 | APPROVED |
07/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/02/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01146
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
06/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
06/09/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/09/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/02/2024 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/09/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01146
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2023 | BULD - Electrical Clearance | N/A | Re-inspection required | Not ready, per previous notes. 11/27/2023 |
11/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Support duct registers on 3 sides, support 4-gang box, missing clean outs at second floor. Add clean outs or revise plans to show current plumbing layout of house and provide at final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01146
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/05/2023 | COT - RSPL - Backwater Valve | Passed | 9/5/23: ok to backfill | |
09/05/2023 | COT - RSPL - Yard Water Line | Passed | 9/5/23: ok to backfill | |
09/05/2023 | COT - RSPL - Sewer | Passed | 9/5/23: ok to backfill | |
09/05/2023 | COT - RSPL - Rough Soil | Passed | 9/5/23: ok to backfill | |
09/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/13/2023 | COT - RSBU - Preslab | Passed | ||
09/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
09/13/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/26/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/26/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/03/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/27/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/21/2023 | BULD - Electrical Clearance | Passed | ||
01/30/2024 | COT - BULD - SWG Clearance | Passed | ||
01/31/2024 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly labeled, AFCI breakers & GFCI receptacles are properly installed. All light fixtures are installed and functioning properly. Outdoor lights are installed and per plans. | |
01/31/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is complete per plans. | |
01/31/2024 | COT - RSME - Mechanical Final | Passed | Mechanical equipment is installed and has proper fuses. All supply and return registers are installed. All doors are undercut for ventilation. | |
01/31/2024 | COT - RSPL - Plumbing Final | Passed | Plumbing fixtures are installed and operational. | |
01/31/2024 | RSBU - Building Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy, once everyone else has approved. | |
01/31/2024 | ENGR Engineering Final | Passed | Cut clean out pipes down to grade and remove any construction materials from site. | |
07/02/2024 | RSBU - Building Progress | Passed | ||
07/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Finals have been approved. 7/2/2024 |