Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/09/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065

Permit Reviews

Permit Number - TC-MDP-0623-01146
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date Submittal Complete Date Status  
06/09/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/12/2023 APPROVED Review Details
07/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01146
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date Description Comments
06/10/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
06/09/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/09/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/02/2024 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/09/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01146
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/27/2023 BULD - Electrical Clearance N/A Re-inspection required Not ready, per previous notes. 11/27/2023
11/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Support duct registers on 3 sides, support 4-gang box, missing clean outs at second floor. Add clean outs or revise plans to show current plumbing layout of house and provide at final.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01146
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/05/2023 COT - RSPL - Backwater Valve Passed 9/5/23: ok to backfill
09/05/2023 COT - RSPL - Yard Water Line Passed 9/5/23: ok to backfill
09/05/2023 COT - RSPL - Sewer Passed 9/5/23: ok to backfill
09/05/2023 COT - RSPL - Rough Soil Passed 9/5/23: ok to backfill
09/13/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/13/2023 COT - RSBU - Preslab Passed
09/13/2023 COT - RSEL - Electrical Underground Passed
09/13/2023 COT - RSEL - Grounding/Bonding Passed
09/26/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/26/2023 COT - RSBU - Roof Nailing Passed
11/03/2023 COT - RSPL - Gas Pressure Test Passed
11/27/2023 COT - RSBU - Interior Shear Bracing Passed
12/21/2023 BULD - Electrical Clearance Passed
01/30/2024 COT - BULD - SWG Clearance Passed
01/31/2024 COT - RSEL - Electrical Final Passed Electrical panel is properly labeled, AFCI breakers & GFCI receptacles are properly installed. All light fixtures are installed and functioning properly. Outdoor lights are installed and per plans.
01/31/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is complete per plans.
01/31/2024 COT - RSME - Mechanical Final Passed Mechanical equipment is installed and has proper fuses. All supply and return registers are installed. All doors are undercut for ventilation.
01/31/2024 COT - RSPL - Plumbing Final Passed Plumbing fixtures are installed and operational.
01/31/2024 RSBU - Building Final Passed Construction is complete. Okay to issue Certificate of Occupancy, once everyone else has approved.
01/31/2024 ENGR Engineering Final Passed Cut clean out pipes down to grade and remove any construction materials from site.
07/02/2024 RSBU - Building Progress Passed
07/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Finals have been approved. 7/2/2024

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 72 FINAL SPECIAL INSPECTION CERTIFICATE-2024-07-01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 72 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 72 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 72 SPECIAL INSPECTION CERTIFICATE-2023-06-09_V1.PDF DOCUMENTS VIEW