Status:
Complete
Type:
Model Building Permit
Apply Date:
06/13/2023
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0623-01142
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/26/2024 APPROVED Review Details
06/14/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/15/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01142
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
06/14/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/14/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/14/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01142
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
12/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 12-4-23: Stud shoe and bang plate have been installed on 1st floor powder room. Still need plan revision for garage lighting circuit and install 12 gauge wire for all exterior outlets, including the equipment service outlet.
03/01/2024 COT - RSEL - Electrical Final N/A Not Ready Not ready workers in house, roof not completed
03/01/2024 COT - RSEL - Outdoor Lighting N/A Not Ready Not ready workers in house, roof not completed
03/01/2024 COT - RSME - Mechanical Final N/A Not Ready Not ready workers in house, roof not completed
03/01/2024 COT - RSPL - Plumbing Final N/A Not Ready Not ready workers in house, roof not completed
03/01/2024 RSBU - Building Final N/A Not Ready Not ready workers in house, roof not completed
03/01/2024 RSBU - Building Progress N/A Not Ready Not ready workers in house, roof not completed
03/01/2024 ENGR Engineering Final N/A Not Ready Landscaping will start next week and inspection recalled when completed.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01142
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/29/2023 COT - RSPL - Yard Water Line Passed
08/29/2023 COT - RSPL - Sewer Passed
08/29/2023 COT - RSPL - Rough Soil Passed
09/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/12/2023 COT - RSBU - Preslab Passed
09/12/2023 COT - RSEL - Electrical Underground Passed
09/12/2023 COT - RSEL - Grounding/Bonding Passed
09/28/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/28/2023 COT - RSBU - Roof Nailing Passed
11/29/2023 BULD - Electrical Clearance Passed 1/12/24 clerance resent
11/29/2023 COT - RSPL - Gas Pressure Test Passed
12/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/08/2024 COT - RSBU - Interior Shear Bracing Passed
02/09/2024 COT - BULD - SWG Clearance Passed
03/14/2024 COT - RSEL - Electrical Final Passed
03/14/2024 COT - RSEL - Outdoor Lighting Passed
03/14/2024 COT - RSME - Mechanical Final Passed
03/14/2024 COT - RSPL - Plumbing Final Passed
03/14/2024 RSBU - Building Final Passed
03/14/2024 RSBU - Building Progress Passed
03/14/2024 ENGR Engineering Final Passed Repair grade/landscape rock on right side of garage please.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 122 FINAL SPECIAL INSPECTION CERTIFICATE-2024-08-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 122 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 122 SPECIAL INSPECTION CERTIFICATE-2023-06-13_V1.PDF DOCUMENTS VIEW
LOT 122 PLOT PLAN_V1.PDF DOCUMENTS VIEW