Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/02/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028

Permit Reviews

Permit Number - TC-MDP-0623-01139
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date Submittal Complete Date Status  
10/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/28/2024 APPROVED Review Details
01/02/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/04/2024 APPROVED Review Details
05/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 APPROVED Review Details
04/12/2024 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/13/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01139
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date Description Comments
05/17/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/02/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/02/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/03/2024 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01139
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/24/2024 ENGR Engineering Final N/A Not Ready 1) no address
2) nursery stake
3) cut down the clean out in front yard
4) no gate
5) unsafe conditions with roof still being stocked with tile
6) property line walls still being worked on.
7) electrical panel not completed

Why was this house called for final?

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01139
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
146784 PT LOT 27 COMPLETE-2024-05-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 27 PLOT PLAN REV 1_V1.PDF DOCUMENTS VIEW
TC-MDP-0623-01139 REVISION 4.11.24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 27 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 27 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 27 SPECIAL INSPECTION CERTIFICATE-2024-01-02_V1.PDF DOCUMENTS VIEW