Permit: TC-MDP-0623-01139
Permit Details
Apply Date:
01/02/2024
Applicant:
Daria Hopkins
Description:
SFR 230.2380 T21-M0028
Permit Reviews
Permit Number - TC-MDP-0623-01139
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2024 | APPROVED |
01/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/04/2024 | APPROVED |
05/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/17/2024 | APPROVED |
04/12/2024 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/13/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01139
Permit Status: Complete
Permit Description: SFR 230.2380 T21-M0028
Date | Description | Comments |
---|---|---|
05/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/03/2024 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01139
Permite Description: SFR 230.2380 T21-M0028
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/24/2024 | ENGR Engineering Final | N/A | Not Ready | 1) no address 2) nursery stake 3) cut down the clean out in front yard 4) no gate 5) unsafe conditions with roof still being stocked with tile 6) property line walls still being worked on. 7) electrical panel not completed Why was this house called for final? |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01139
Permit Description: SFR 230.2380 T21-M0028
Total Completed Inspections - 21