Permit Reviews
Permit Number - TC-MDP-0623-01131
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2024 | APPROVED |
| 09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
| 11/09/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 11/15/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01131
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
| Date | Description | Comments |
|---|---|---|
| 11/09/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/09/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 11/14/2023 | Post-Tension Inspection Report is required. | |
| 06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01131
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2024 | COT - RSPL - Rough Soil | Passed | ||
| 01/10/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 01/10/2024 | COT - RSPL - Sewer | Passed | ||
| 01/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 01/16/2024 | COT - RSBU - Preslab | Passed | ||
| 01/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 01/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/31/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Roof trusses are in place, H2.5 clips are installed on every truss, exterior shear plywood is installed and properly nailed off per plan requirements, roof sheathing is installed and properly nailed off to trusses. Okay to proceed with dry-in of walls and roof. | |
| 01/31/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are in place, H2.5 clips are installed on every truss, exterior shear plywood is installed and properly nailed off per plan requirements, roof sheathing is installed and properly nailed off to trusses. Okay to proceed with dry-in of walls and roof. | |
| 02/16/2024 | BULD - Electrical Clearance | Passed | ||
| 03/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/06/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/21/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/01/2024 | COT - BULD - SWG Clearance | Passed | ||
| 05/21/2024 | ENGR Engineering Final | Passed | ||
| 05/24/2024 | COT - RSEL - Electrical Final | Passed | ||
| 05/24/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/24/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 05/24/2024 | RSBU - Building Progress | Passed | ||
| 05/31/2024 | COT - RSME - Mechanical Final | Passed | ||
| 05/31/2024 | RSBU - Building Final | Passed |