Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/10/2023
Applicant:
Daria Hopkins
Description:
SFR 230.2690 T21-M0027

Permit Reviews

Permit Number - TC-MDP-0623-01130
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Start Date Submittal Complete Date Status  
09/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2023 APPROVED Review Details
08/11/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 08/15/2023 APPROVED Review Details
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01130
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Total Outstanding Activity Conditions - 2
Date Name
08/14/2023 Building permit for the retaining wall is required before finalization
08/14/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0623-01130
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Date Description Comments
08/11/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/11/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/14/2023 Post-Tension Inspection Report is required.
06/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01130
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/30/2023 COT - RSPL - Yard Water Line Passed
10/30/2023 COT - RSPL - Rough Soil Passed
10/30/2023 COT - RSPL - Sewer Passed
11/06/2023 COT - RSBU - Preslab Passed
11/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/06/2023 COT - RSEL - Electrical Underground Passed
11/06/2023 COT - RSEL - Grounding/Bonding Passed
12/04/2023 COT - RSBU - Exterior Clips/Sheathing Passed All hold downs are properly nailed, H2.5 clips are installed on floor rafters and roof trusses, and sheathing is properly installed per plans and nailed off.
12/04/2023 COT - RSBU - Roof Nailing Passed Roof is properly nailed down.
01/22/2024 BULD - Electrical Clearance Passed
01/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/29/2024 COT - RSPL - Gas Pressure Test Passed
02/16/2024 COT - RSBU - Interior Shear Bracing Passed
03/21/2024 COT - BULD - SWG Clearance Passed
04/26/2024 COT - RSEL - Electrical Final Passed
04/26/2024 COT - RSEL - Outdoor Lighting Passed
04/26/2024 COT - RSME - Mechanical Final Passed
04/26/2024 RSBU - Building Progress Passed
04/26/2024 ENGR Engineering Final Passed
04/29/2024 COT - RSPL - Plumbing Final Passed
04/29/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
143710 PT LOT 117 COMPLETE-2024-02-27_V1.PDF DOCUMENTS VIEW
LOT 117 SPECIAL INSPECTION CERTIFICATE-2023-09-28_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 117 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 117 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 117 SPECIAL INSPECTION CERTIFICATE-2023-08-10_V1.PDF DOCUMENTS VIEW