Permit: TC-MDP-0623-01126
Permit Details
Apply Date:
06/13/2023
Applicant:
Dana Petty
Description:
SFR 230.2690 T21-M0027
Permit Reviews
Permit Number - TC-MDP-0623-01126
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/14/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/15/2023 | APPROVED |
08/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2024 | REQUIRES RESUBMIT |
08/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/30/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01126
Permit Status: Complete
Permit Description: SFR 230.2690 T21-M0027
Date | Description | Comments |
---|---|---|
06/14/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
06/14/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01126
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/04/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Mechanical and plumbing are complete. Partial pass on electrical because outside outlets are not installed with a 12 gauge wire. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01126
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 21