Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/09/2023
Applicant:
Andrea Flood
Description:
SFR F50A22 T22-M0021

Permit Reviews

Permit Number - TC-MDP-0623-01124
Permit Status: Complete
Permit Description: SFR F50A22 T22-M0021
Start Date Submittal Complete Date Status  
11/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/09/2023 REQUIRES RESUBMIT Review Details
09/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/20/2023 APPROVED Review Details
12/20/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/23/2023 APPROVED Review Details
06/29/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/03/2023 APPROVED Review Details
06/09/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/13/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01124
Permit Status: Complete
Permit Description: SFR F50A22 T22-M0021
Date Description Comments
06/10/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
06/09/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/09/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/09/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/20/2023 Post-Tension Inspection Report is required.
06/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/09/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01124
Permite Description: SFR F50A22 T22-M0021
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/08/2023 COT - RSME - Mechanical Final N/A Re-inspection required 12/8/23: top of AC platform is required to be 3” above grade.
12/08/2023 RSBU - Building Final N/A Re-inspection required 12/8/23: top of AC platform is required to be 3” above grade.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01124
Permit Description: SFR F50A22 T22-M0021
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/07/2023 COT - RSPL - Rough Soil Passed
07/07/2023 COT - RSPL - Sewer Passed
07/18/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/18/2023 COT - RSBU - Preslab Passed
07/18/2023 COT - RSEL - Electrical Underground Passed
07/18/2023 COT - RSEL - Grounding/Bonding Passed
08/14/2023 COT - RSBU - Roof Nailing Passed
08/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed Missing anchor bolts and rsp4 clips throughout.
09/19/2023 COT - RSPL - Gas Pressure Test Passed
09/19/2023 COT - RSPL - Yard Water Line Passed
09/26/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/26/2023 BULD - Electrical Clearance Passed
10/04/2023 COT - RSBU - Interior Shear Bracing Passed
11/21/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
12/08/2023 COT - RSEL - Electrical Final Passed
12/08/2023 COT - RSEL - Outdoor Lighting Passed
12/08/2023 COT - RSPL - Plumbing Final Passed
12/08/2023 RSBU - Building Progress Passed
12/08/2023 ENGR Engineering Final Passed
12/11/2023 COT - RSME - Mechanical Final Passed
12/11/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COMMENT RESPONSE MANUFACTURER DELIVERY TRUSS PACKAGE LOT 3317_V2.PDF DOCUMENTS VIEW
152455 - SAGUARO TRAIL LOT 3317 - PT REPORT-2023-09-19_V1.PDF DOCUMENTS VIEW
SPAPP-P20WP00249 FINAL ACCEPTANCE-2023-09-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_REVISION_NARRATIVE_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_REVISION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-09_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-09_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW