Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0623-01122
Permit Details
Apply Date:
01/26/2024
Applicant:
Paul Schmidt
Description:
STF40K T20-M0039 Revision Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0623-01122
Permit Status: Inspections complete
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0623-01122
Permit Status: Inspections complete
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
01/26/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
01/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
01/26/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
01/26/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
01/29/2024 | Post-Tension Inspection Report is required. |
01/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0623-01122
Permit Status: Inspections complete
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Date | Description | Comments |
---|---|---|
06/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01122
Permit Description: STF40K T20-M0039 Revision Truss Calcs
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/27/2024 | COT - RSPL - Yard Water Line | Passed | ||
03/27/2024 | COT - RSPL - Sewer | Passed | ||
03/27/2024 | COT - RSPL - Rough Soil | Passed | ||
04/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/09/2024 | COT - RSBU - Preslab | Passed | ||
04/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior walls are properly secured to floor with red head bolts, shot pins, or masa clips. Shear wall hold down is properly installed in garage wall between garage and house. Windows and doors frames are properly wrapped and installed. Okay to proceed stucco dry-in. | |
05/06/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly secured to roof trusses per code. Okay to proceed with top out of plumbing. | |
06/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/11/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
06/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/12/24: DWV is under a water test and not leaking. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall throughout. | |
07/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/12/2024 | COT - BULD - SWG Clearance | Passed | All appliance locations have a gas valve installed. Okay to install meter and turn on gas. SWG Clearance issued for Southwest Gas Company. | |
08/28/2024 | COT - RSEL - Electrical Final | Passed | Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy. | |
08/28/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy. | |
08/28/2024 | COT - RSME - Mechanical Final | Passed | Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy. | |
08/28/2024 | COT - RSPL - Plumbing Final | Passed | Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy. | |
08/28/2024 | ENGR Engineering Final | Passed | ||
08/28/2024 | RSBU - Building Final | Passed | Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy. | |
08/28/2024 | RSBU - Building Progress | Passed | Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy. |