Permit Reviews

Permit Number - TC-MDP-0623-01117
Permit Status: Inspections complete
Permit Description: SFR F40I22 T22-M0023
Start Date Submittal Complete Date Status  
11/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/09/2023 APPROVED Review Details
06/28/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/03/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0623-01117
Permit Status: Inspections complete
Permit Description: SFR F40I22 T22-M0023
Total Outstanding Activity Conditions - 3
Date Name
06/28/2023 Building permit for retaining wall required prior to finalization
06/28/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0623-01117
Permit Status: Inspections complete
Permit Description: SFR F40I22 T22-M0023
Date Description Comments
06/28/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01117
Permite Description: SFR F40I22 T22-M0023
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/29/2023 COT - RSBU - Roof Nailing N/A Canceled Canceled still working in home. 8/29/2023
08/29/2023 COT - RSBU - Exterior Clips/Sheathing N/A Canceled Canceled still working in home. 8/29/2023
04/12/2024 ENGR Engineering Final N/A Partial Pass Concrete under East side gate entry to back yard has a jagged edge on each end higher then finish grade causing a potential trip hazard, spoke to Superintendent Matt he will schedule this to be completed and will recall inspection.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0623-01117
Permit Description: SFR F40I22 T22-M0023
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/24/2023 COT - RSPL - Rough Soil Passed
07/24/2023 COT - RSPL - Sewer Passed
07/24/2023 COT - RSPL - Backwater Valve Passed
08/01/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/08/2023 COT - RSPL - Yard Water Line Passed
08/08/2023 COT - RSEL - Grounding/Bonding Passed
08/08/2023 COT - RSBU - Preslab Passed
08/08/2023 COT - RSEL - Electrical Underground Passed
08/30/2023 COT - RSBU - Roof Nailing Passed
09/08/2023 COT - RSBU - Exterior Clips/Sheathing Passed 9/8/23 missing one anchor bolt will check at intermediate
11/02/2023 BULD - Electrical Clearance Passed
11/02/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/02/2023 COT - RSPL - Gas Pressure Test Passed
11/20/2023 COT - RSBU - Interior Shear Bracing Passed
02/14/2024 COT - BULD - SWG Clearance Passed SWG for meter only
04/12/2024 COT - RSEL - Electrical Final Passed
04/12/2024 COT - RSEL - Outdoor Lighting Passed
04/12/2024 COT - RSME - Mechanical Final Passed
04/12/2024 COT - RSPL - Plumbing Final Passed
04/12/2024 RSBU - Building Progress Passed
05/14/2024 ENGR Engineering Final Passed
05/14/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
152455 - SAGUARO TRAILS PHASE 4 LOT 4384 - PT REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-26_V1.PDF DOCUMENTS VIEW