Permit: TC-MDP-0623-01111
Permit Details
Apply Date:
07/07/2023
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - TC-MDP-0623-01111
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/21/2023 | APPROVED |
07/07/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/11/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0623-01111
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
01/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/21/2023 | Post-Tension Inspection Report is required. | |
06/02/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01111
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/15/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 2/15/24: floor receptacle not installed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0623-01111
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/07/2023 | COT - RSPL - Yard Water Line | Passed | ||
08/07/2023 | COT - RSPL - Sewer | Passed | ||
08/07/2023 | COT - RSPL - Rough Soil | Passed | ||
08/07/2023 | COT - RSPL - Backwater Valve | Passed | ||
08/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings are properly dug, ufer ground is in place. Post-tension cables are properly installed. Plumbing is properly wrapped. Okay to pour concrete monolithic pads. | |
08/14/2023 | COT - RSBU - Preslab | Passed | Footings are properly dug, ufer ground is in place. Post-tension cables are properly installed. Plumbing is properly wrapped. Okay to pour concrete monolithic pads. | |
08/14/2023 | COT - RSEL - Electrical Underground | Passed | Underground electrical for kitchen island is in place. | |
08/14/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place | |
09/26/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/28/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 9/28/2023 | |
11/06/2023 | BULD - Electrical Clearance | Passed | Electrical panel is properly installed, conduit sweep from meter box to transformer is in place. ECO Electrical Clearance issued for unit. Okay to energize power system. | |
11/15/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
11/16/2023 | RSBU - Building Progress | Passed | ||
12/01/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas piping is under air pressure and holding 15# psi.. | |
12/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in complete. Okay to proceed with insulation. | |
01/03/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Drywall is properly installed and screwed off for all firewalls. Okay to proceed with tape and texture. | |
02/15/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
02/20/2024 | COT - RSEL - Electrical Final | Passed | ||
02/20/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/20/2024 | COT - RSME - Mechanical Final | Passed | ||
02/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/20/2024 | ENGR Engineering Final | Passed | ||
02/21/2024 | RSBU - Building Final | Passed |