Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/07/2023
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050

Permit Reviews

Permit Number - TC-MDP-0623-01111
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date Submittal Complete Date Status  
09/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/21/2023 APPROVED Review Details
07/07/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/11/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0623-01111
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date Description Comments
01/03/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/21/2023 Post-Tension Inspection Report is required.
06/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01111
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/15/2024 COT - RSEL - Electrical Final N/A Re-inspection required 2/15/24: floor receptacle not installed.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0623-01111
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date Description Inspector Results Comments
08/07/2023 COT - RSPL - Yard Water Line Passed
08/07/2023 COT - RSPL - Sewer Passed
08/07/2023 COT - RSPL - Rough Soil Passed
08/07/2023 COT - RSPL - Backwater Valve Passed
08/14/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Footings are properly dug, ufer ground is in place. Post-tension cables are properly installed. Plumbing is properly wrapped. Okay to pour concrete monolithic pads.
08/14/2023 COT - RSBU - Preslab Passed Footings are properly dug, ufer ground is in place. Post-tension cables are properly installed. Plumbing is properly wrapped. Okay to pour concrete monolithic pads.
08/14/2023 COT - RSEL - Electrical Underground Passed Underground electrical for kitchen island is in place.
08/14/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place
09/26/2023 COT - RSBU - Roof Nailing Passed
09/28/2023 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 9/28/2023
11/06/2023 BULD - Electrical Clearance Passed Electrical panel is properly installed, conduit sweep from meter box to transformer is in place. ECO Electrical Clearance issued for unit. Okay to energize power system.
11/15/2023 COT - RSBU - Interior Shear Bracing Passed
11/16/2023 RSBU - Building Progress Passed
12/01/2023 COT - RSPL - Gas Pressure Test Passed Gas piping is under air pressure and holding 15# psi..
12/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in complete. Okay to proceed with insulation.
01/03/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed Drywall is properly installed and screwed off for all firewalls. Okay to proceed with tape and texture.
02/15/2024 COT - BULD - SWG Clearance Passed SWG for meter only
02/20/2024 COT - RSEL - Electrical Final Passed
02/20/2024 COT - RSEL - Outdoor Lighting Passed
02/20/2024 COT - RSME - Mechanical Final Passed
02/20/2024 COT - RSPL - Plumbing Final Passed
02/20/2024 ENGR Engineering Final Passed
02/21/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 16-2023-09-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 16 PT CERT-2023-07-07_V1.PDF DOCUMENTS VIEW
PLOT PLAN FOR PERMIT_V1.PDF DOCUMENTS VIEW