Permit: TC-MDP-0526-00326
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
2644 S J CHRISTOPHER ST
Address NEW:
2644 S J CHRISTOPHER ST
Apply Date:
06/29/2026
Applicant:
Mark Alteri
Description:
1520t SFR Model Plan (Model Master Plan TC-MDP-0326-00114)
Permit Reviews
Permit Number - TC-MDP-0526-00326
Permit Status: Inspections
Permit Description: 1520t SFR Model Plan (Model Master Plan TC-MDP-0326-00114)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0526-00326
Permit Status: Inspections
Permit Description: 1520t SFR Model Plan (Model Master Plan TC-MDP-0326-00114)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/07/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 05/07/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0526-00326
Permit Status: Inspections
Permit Description: 1520t SFR Model Plan (Model Master Plan TC-MDP-0326-00114)
| Date | Description | Comments |
|---|---|---|
| 05/07/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/07/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0526-00326
Permit Description: 1520t SFR Model Plan (Model Master Plan TC-MDP-0326-00114)
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2026 | COT - RSPL - Sewer | Passed | 07/30/2026 Holding under test to HCS, ok to backfill with shading material. |
|
| 07/30/2026 | COT - RSPL - Yard Water Line | Passed | 07/30/2026 Holding under test, ok to backfill with shading material. |
|
| 07/30/2026 | COT - RSPL - Rough Soil | Passed | 07/30/2026 Holding under test, ok to backfill with shading material. |
|
| 08/06/2026 | COT - RSBU - Preslab | Passed | 08/06/2026 Approved per plan and reinforcements. Okay to pour concrete. |
|
| 08/06/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 08/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed |