Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
1236 E FIMBRES ST
Apply Date:
08/11/2026
Applicant:
Mark Alteri
Description:
Model Plan 1074 (2024 IRC) (Model Master Plan TC-MDP-0426-00219)

Permit Reviews

Permit Number - TC-MDP-0526-00301
Permit Status: Inspections
Permit Description: Model Plan 1074 (2024 IRC) (Model Master Plan TC-MDP-0426-00219)
Start Date Submittal Complete Date Status  
08/13/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/20/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0526-00301
Permit Status: Inspections
Permit Description: Model Plan 1074 (2024 IRC) (Model Master Plan TC-MDP-0426-00219)
Total Outstanding Activity Conditions - 3
Date Name
05/07/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
05/07/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/20/2026 Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0526-00301
Permit Status: Inspections
Permit Description: Model Plan 1074 (2024 IRC) (Model Master Plan TC-MDP-0426-00219)
Date Description Comments
05/07/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/07/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0526-00301
Permit Description: Model Plan 1074 (2024 IRC) (Model Master Plan TC-MDP-0426-00219)
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/04/2026 COT - RSPL - Yard Water Line Passed 9-4-26 Move Rocky materials shading is required
09/04/2026 COT - RSPL - Sewer Passed 9-4-26 Move Rocky materials shading is required
09/04/2026 COT - RSPL - Rough Soil Passed 9-4-26 Move Rocky materials shading is required
09/14/2026 COT - RSBU - Excavation/Rebar/Zoning Passed
09/14/2026 COT - RSBU - Preslab Passed 09/14/2026
Approved per plan and reinforcement. Okay for concrete placement.
09/14/2026 COT - RSEL - Electrical Underground Passed
10/09/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed
10/09/2026 COT - RSBU - Roof Nailing Passed Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
LOT 74 PT CERT-2026-08-11_V1.PDF DOCUMENTS VIEW
PRL 74 PP FOR SUBMITTAL_V1.PDF DOCUMENTS VIEW