Permit: TC-MDP-0525-00319
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6752 E PASEO DON OCTAVIO
Address NEW:
6752 E PASEO DON OCTAVIO
Apply Date:
05/28/2025
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Permit Reviews
Permit Number - TC-MDP-0525-00319
Permit Status: Inspections complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/26/2025 | APPROVED |
| 06/06/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/13/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0525-00319
Permit Status: Inspections complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
| Date | Description | Comments |
|---|---|---|
| 06/10/2025 | Post-Installed Anchor Inspection Report is required. | |
| 06/10/2025 | Post-Tension Inspection Report is required. | |
| 05/30/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/30/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0525-00319
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | COT - RSPL - Rough Soil | Passed | 10-8-25: rough soil/underground plumbing verified per plans.Okay to backfill with shading materials. | |
| 10/08/2025 | COT - RSPL - Sewer | Passed | 10-8-25: sewer, rough soil/underground plumbing verified per plans.Okay to backfill with shading materials. | |
| 10/08/2025 | COT - RSPL - Yard Water Line | Passed | 10-8-25: main water line approved-okay to backfill with shading materials. | |
| 10/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/16/2025 | COT - RSBU - Preslab | Passed | ||
| 10/16/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 10/27/2025 | COT - RSBU - Roof Nailing | Passed | 10.27.2025 Corrections made to 10.22.2025 inspection. |
|
| 10/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.29.2025 Column base repaired and anchored. |
|
| 10/31/2025 | BULD - Electrical Clearance | Passed | 10.31.2025 Clearance TEP ECO. |
|
| 10/31/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/31/2025 | COT - RSPL - Gas Pressure Test | Passed | 10.31.2025 Approved and holding under test. |
|
| 10/31/2025 | RSBU - Building Progress | Passed | ||
| 11/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.03.2025 Corrections made to 10.31.2025 inspection. |
|
| 11/12/2025 | COT - RSBU - Interior Shear Bracing | Passed | 11-12-25: interior shear bracing approved. Okay for tape & texture. | |
| 12/15/2025 | COT - BULD - SWG Clearance | Passed | 12/15/2025 Clearance for Southwest Gas. |
|
| 12/19/2025 | COT - RSEL - Electrical Final | Passed | ||
| 12/19/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/19/2025 | COT - RSME - Mechanical Final | Passed | ||
| 12/19/2025 | COT - RSPL - Plumbing Final | Passed | 12/19/2025 Verified sealed driveway cleanout. |
|
| 12/19/2025 | RSBU - Building Final | Passed | ||
| 12/19/2025 | ENGR Engineering Final | Passed | Site in complete in accordance with approved plans. |