Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/28/2025
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)

Permit Reviews

Permit Number - TC-MDP-0525-00319
Permit Status: Inspections complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Start Date Submittal Complete Date Status  
11/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/26/2025 APPROVED Review Details
06/06/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/13/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0525-00319
Permit Status: Inspections complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Date Description Comments
06/10/2025 Post-Installed Anchor Inspection Report is required.
06/10/2025 Post-Tension Inspection Report is required.
05/30/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/30/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0525-00319
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/08/2025 COT - RSPL - Rough Soil Passed 10-8-25: rough soil/underground plumbing verified per plans.Okay to backfill with shading materials.
10/08/2025 COT - RSPL - Sewer Passed 10-8-25: sewer, rough soil/underground plumbing verified per plans.Okay to backfill with shading materials.
10/08/2025 COT - RSPL - Yard Water Line Passed 10-8-25: main water line approved-okay to backfill with shading materials.
10/16/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/16/2025 COT - RSBU - Preslab Passed
10/16/2025 COT - RSEL - Electrical Underground Passed
10/27/2025 COT - RSBU - Roof Nailing Passed 10.27.2025
Corrections made to 10.22.2025 inspection.
10/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10.29.2025
Column base repaired and anchored.
10/31/2025 BULD - Electrical Clearance Passed 10.31.2025
Clearance TEP ECO.
10/31/2025 COT - RSEL - Grounding/Bonding Passed
10/31/2025 COT - RSPL - Gas Pressure Test Passed 10.31.2025
Approved and holding under test.
10/31/2025 RSBU - Building Progress Passed
11/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11.03.2025
Corrections made to 10.31.2025 inspection.
11/12/2025 COT - RSBU - Interior Shear Bracing Passed 11-12-25: interior shear bracing approved. Okay for tape & texture.
12/15/2025 COT - BULD - SWG Clearance Passed 12/15/2025
Clearance for Southwest Gas.
12/19/2025 COT - RSEL - Electrical Final Passed
12/19/2025 COT - RSEL - Outdoor Lighting Passed
12/19/2025 COT - RSME - Mechanical Final Passed
12/19/2025 COT - RSPL - Plumbing Final Passed 12/19/2025
Verified sealed driveway cleanout.
12/19/2025 RSBU - Building Final Passed
12/19/2025 ENGR Engineering Final Passed Site in complete in accordance with approved plans.

Documents

File Name Document Type  
157371 PT LOT 111 COMPLETE-2025-11-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 111 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 111 SPECIAL INSPECTION CERTIFICATE-2025-06-05_V1.PDF DOCUMENTS VIEW