Permit: TC-MDP-0525-00296
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6487 E PASEO ALGA
Address NEW:
6487 E PASEO ALGA
Apply Date:
06/06/2025
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Permit Reviews
Permit Number - TC-MDP-0525-00296
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 06/17/2025 | APPROVED |
| 12/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/29/2025 | APPROVED |
| 05/28/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0525-00296
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Date | Description | Comments |
|---|---|---|
| 06/09/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/09/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/15/2025 | Post-Tension Inspection Report is required. | |
| 05/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/15/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 06/09/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00296
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/13/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 08/18/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 8.18.25 uffer |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00296
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 19