Permit: TC-MDP-0525-00295
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6479 E PASEO ALGA
Address NEW:
6479 E PASEO ALGA
Apply Date:
05/06/2025
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Permit Reviews
Permit Number - TC-MDP-0525-00295
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2026 | SPECIAL INSPECTION REVIEW v.2 | 02/26/2026 | APPROVED |
| 02/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 02/24/2026 | REQUIRES RESUBMIT |
| 06/27/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/03/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0525-00295
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
| Date | Description | Comments |
|---|---|---|
| 06/30/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/30/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/15/2025 | Post-Tension Inspection Report is required. | |
| 05/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/15/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 06/30/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00295
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/04/2025 | COT - RSEL - Electrical Underground | N/A | Not Ready | 9.4.2025 Not ready. |
| 09/04/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 9.4.2025 Not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00295
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2025 | COT - RSPL - Yard Water Line | Passed | 9.4.2025 Okay to backfill, shading required. |
|
| 09/04/2025 | COT - RSPL - Rough Soil | Passed | 9.4.2025 Okay to backfill, shading required. |
|
| 09/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.10.25 APPROVED |
|
| 09/10/2025 | COT - RSBU - Preslab | Passed | ||
| 09/10/2025 | COT - RSEL - Grounding/Bonding | Passed | 9.10.25 APPROVED |
|
| 10/01/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/03/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/16/2025 | BULD - Electrical Clearance | Passed | ECO NEW POWER | |
| 10/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.28.2025 Approved, added foam at penetrations and lowered thermostat. |
|
| 10/28/2025 | COT - RSPL - Sewer | Passed | ||
| 11/06/2025 | COT - RSBU - Interior Shear Bracing | Passed | 11.06.2025 Approved per plan. |
|
| 03/31/2026 | COT - RSEL - Electrical Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSEL - Outdoor Lighting | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSME - Mechanical Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSPL - Plumbing Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | ENGR Engineering Final | Passed | HCS Collar for cap/plug in not glued correct. The pipe needs to be trimmed so cut is clean and perpendicular to have sealed connection. Currently pipe is end is jagged. | |
| 03/31/2026 | RSBU - Building Final | Passed | 3.31.26 Approved |
|
| 03/31/2026 | RSBU - Building Progress | Passed | 3.31.26 Approved |