Permit: TC-MDP-0525-00287
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6491 E PASEO ALGA
Address NEW:
6491 E PASEO ALGA
Apply Date:
06/05/2025
Applicant:
Brianna Quiroz
Description:
SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Permit Reviews
Permit Number - TC-MDP-0525-00287
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/23/2025 | RESTAMP - RESIDENTIAL v.1 | 06/25/2025 | APPROVED |
| 06/06/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 06/17/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 06/23/2025 | APPROVED |
| 05/28/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/28/2025 | REQUIRES RESUBMIT |
| 12/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/29/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0525-00287
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
| Date | Description | Comments |
|---|---|---|
| 06/09/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/09/2025 | Post-Installed Anchor Inspection Report is required. | |
| 06/09/2025 | Post-Tension Inspection Report is required. | |
| 05/05/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/05/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 06/09/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 12/29/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00287
Permite Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/15/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | na |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00287
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2025 | COT - RSPL - Rough Soil | Passed | 8.15.25 trench conditions verified Blue tracer verified Green tracer verified 2way verified Depth verified DWV under test Main water under test APPROVED, OK TO BACKFILL |
|
| 08/15/2025 | COT - RSPL - Sewer | Passed | 8.15.25 trench conditions verified Blue tracer verified Green tracer verified 2way verified Depth verified DWV under test Main water under test APPROVED, OK TO BACKFILL |
|
| 08/15/2025 | COT - RSPL - Yard Water Line | Passed | 8.15.25 trench conditions verified Blue tracer verified Green tracer verified 2way verified Depth verified DWV under test Main water under test APPROVED, OK TO BACKFILL |
|
| 08/19/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 8.19.25 APPROVED |
|
| 08/19/2025 | COT - RSBU - Preslab | Passed | 8.19.25 APPROVED |
|
| 08/19/2025 | COT - RSEL - Electrical Underground | Passed | 8.19.25 APPROVED |
|
| 09/09/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 09/15/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.1.25 Approved |
|
| 10/01/2025 | COT - RSEL - Grounding/Bonding | Passed | 10.1.25 Approved |
|
| 10/01/2025 | BULD - Electrical Clearance | Passed | ||
| 10/10/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/02/2026 | COT - RSEL - Electrical Final | Passed | ||
| 02/02/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/02/2026 | COT - RSME - Mechanical Final | Passed | ||
| 02/02/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 02/02/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 02/02/2026 | RSBU - Building Final | Passed | ||
| 02/02/2026 | RSBU - Building Progress | Passed |