Permit: TC-MDP-0524-00688
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9122 E RED BLUFF CT
Address NEW:
9122 E RED BLUFF CT
Apply Date:
05/28/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-0524-00688
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 09/24/2024 | APPROVED |
| 09/10/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/10/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00688
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 09/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/19/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0524-00688
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011
| Date | Description | Comments |
|---|---|---|
| 05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00688
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 09/26/2024 | COT - RSPL - Sewer | Passed | ||
| 09/26/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/27/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 10/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/03/2024 | COT - RSBU - Preslab | Passed | ||
| 10/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/18/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with rough-in work. | |
| 10/18/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 11/18/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-18-24, verified at 15 psi. | |
| 11/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11/22/24: DWV is full of water with no leaks, water line is under street pressure, all registers are blocked on 3 sides, and all M, P, & E rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 12/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/20/24 nailing per plan | |
| 01/17/2025 | BULD - Electrical Clearance | Passed | 1/17/25: Blank breaker plates are installed in electrical panel. Okay to energize panel. ECO Clearance issued for 9122 E. Red Bluff Ct. | |
| 02/11/2025 | COT - BULD - SWG Clearance | Passed | Passed clearance SWG 2/11/25 | |
| 02/18/2025 | COT - RSEL - Electrical Final | Passed | 2-18-25, electrical, mechanical, plumbing and building final approved. | |
| 02/18/2025 | COT - RSEL - Outdoor Lighting | Passed | 2-18-25, approved | |
| 02/18/2025 | COT - RSME - Mechanical Final | Passed | 2-18-25, electrical, mechanical, plumbing and building final approved. | |
| 02/18/2025 | COT - RSPL - Plumbing Final | Passed | 2-18-25, electrical, mechanical, plumbing and building final approved. | |
| 02/18/2025 | ENGR Engineering Final | Passed | ||
| 02/18/2025 | RSBU - Building Final | Passed | 2-18-25, electrical, mechanical, plumbing and building final approved. | |
| 02/18/2025 | RSBU - Building Progress | Passed |