Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
06/26/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-0524-00686
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
06/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00686
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 5
Date Name
05/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/27/2024 Post-Tension Inspection Report is required.
06/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0524-00686
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
05/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0524-00686
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/14/24: penetrations in vapor barrier in master bedroom bathroom need to be sealed. Top plate penetrations in garage and Hall way need to be sealed. Missing anchor bolts within 12 inches of end of shear wall need to be installed.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0524-00686
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 13
Date Description Inspector Results Comments
08/06/2024 COT - RSPL - Yard Water Line Passed
08/06/2024 COT - RSPL - Sewer Passed
08/06/2024 COT - RSPL - Rough Soil Passed
08/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/15/2024 COT - RSBU - Preslab Passed
08/15/2024 COT - RSEL - Electrical Underground Passed
08/15/2024 COT - RSEL - Grounding/Bonding Passed
08/23/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate and plywood sheathing is properly secured to trusses with nails and staples. Okay to proceed with top out of plumbing.
08/28/2024 COT - RSBU - Exterior Clips/Sheathing Passed 8/28/24: Titan bolts, red heads, and cut nails have been installed in bottom plate where needed. Loose roof sheathing has been properly nailed.
10/14/2024 COT - RSPL - Gas Pressure Test Passed
10/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/30/2024 BULD - Electrical Clearance Passed 10-30-24, panel okay to be energized.
10/31/2024 COT - RSBU - Interior Shear Bracing Passed 10-31-24, interior shear wall inspection approved. Okay to tape and texture.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 39 REVISED START_V1.PDF DOCUMENTS VIEW