Permit: TC-MDP-0524-00684
Permit Details
Apply Date:
05/30/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-0524-00684
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/31/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00684
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/31/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/31/2024 | Post-Installed Anchor Inspection Report is required. |
05/31/2024 | Post-Tension Inspection Report is required. |
05/31/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0524-00684
Permit Status: Issued
Permit Description: SFR BT1465-130 T22-M0011
Date | Description | Comments |
---|---|---|
05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00684
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 6/25/24: missing plans |
06/25/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 6/25/24: missing plans |
06/25/2024 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | 6/25/24: missing plans |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00684
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2024 | COT - RSPL - Yard Water Line | Passed | Main water supply line is installed from house to meter box. Supply line is under an air pressure test of 70# psi with no leaks. Okay to shade pipe and backfill trench. | |
06/17/2024 | COT - RSPL - Rough Soil | Passed | Plumbing underground is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches. | |
06/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6/26/24: Construction plans are on site. Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
06/26/2024 | COT - RSBU - Preslab | Passed | 6/26/24: Construction plans are on site. Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
06/26/2024 | COT - RSEL - Electrical Underground | Passed | 6/26/24: Construction plans are on site. Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
06/26/2024 | COT - RSEL - Grounding/Bonding | Passed | 6/26/24: Construction plans are on site. Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
07/09/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 7/12/24: Anchor bolts and lateral bracing have been installed where needed. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
08/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
08/14/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under a 15 psi air pressure test with no leaks. Okay to proceed. | |
08/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall in garage is properly installed for the interior shear wall. Okay to proceed with tape, texture, and paint walls and ceilings. | |
09/11/2024 | COT - RSPL - Sewer | Passed | 9/11/24: Sewer is connected and under test. Okay to shade pipe and backfill trench. | |
09/16/2024 | BULD - Electrical Clearance | Passed | Passes electrical clearance ECO 9/16/2024 | |
10/22/2024 | COT - BULD - SWG Clearance | Passed | 10/22/24 PASS. SWG clearence |