Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/03/2024
Applicant:
Dana Petty
Description:
SFR 230.1910 T21-M0029

Permit Reviews

Permit Number - TC-MDP-0524-00676
Permit Status: Complete
Permit Description: SFR 230.1910 T21-M0029
Start Date Submittal Complete Date Status  
12/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2024 APPROVED Review Details
09/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/12/2024 APPROVED Review Details
06/04/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00676
Permit Status: Complete
Permit Description: SFR 230.1910 T21-M0029
Date Description Comments
06/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/04/2024 Post-Tension Inspection Report is required.
05/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00676
Permite Description: SFR 230.1910 T21-M0029
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/18/2024 COT - RSBU - Preslab N/A Re-inspection required 7/18/24: missing hold downs
07/18/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 7/18/24: missing hold downs
11/15/2024 ENGR Engineering Final N/A Not Ready Grade on left side of home needs to be repaired.
Sewer cap in driveway missing.
Low voltage pedestal laying on the ground.
DG piled in driveway.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00676
Permit Description: SFR 230.1910 T21-M0029
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/09/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 7/9/2024
07/09/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 7/9/2024
07/11/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 7/11/2024
07/18/2024 COT - RSEL - Electrical Underground Passed
07/18/2024 COT - RSEL - Grounding/Bonding Passed
07/19/2024 COT - RSBU - Preslab Passed
07/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/01/2024 COT - RSBU - Roof Nailing Passed Corrections were made. 8/1/2024
08/01/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Corrections were made. 8/1/2024
09/05/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/5/2024
09/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 9/5/2024
09/05/2024 COT - RSPL - Gas Pressure Test Passed
09/17/2024 COT - RSBU - Interior Shear Bracing Passed
10/28/2024 COT - BULD - SWG Clearance Passed 10-28-24, SWG clearance inspection approved.
11/22/2024 ENGR Engineering Final Passed CO Ready
11/26/2024 COT - RSEL - Electrical Final Passed 11-26-24, items from previous inspections were corrected. Building, electrical, mechanical, outdoor lighting, plumbing finals all approved.
11/26/2024 COT - RSEL - Outdoor Lighting Passed 11-26-24, items from previous inspections were corrected. Building, electrical, mechanical, outdoor lighting, plumbing finals all approved.
11/26/2024 COT - RSME - Mechanical Final Passed 11-26-24, items from previous inspections were corrected. Building, electrical, mechanical, outdoor lighting, plumbing finals all approved.
11/26/2024 COT - RSPL - Plumbing Final Passed 11-26-24, items from previous inspections were corrected. Building, electrical, mechanical, outdoor lighting, plumbing finals all approved.
11/26/2024 RSBU - Building Final Passed 11-26-24, items from previous inspections were corrected. Building, electrical, mechanical, outdoor lighting, plumbing finals all approved.
11/26/2024 RSBU - Building Progress Passed 11-26-24, items from previous inspections were corrected. Building, electrical, mechanical, outdoor lighting, plumbing finals all approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 40 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 40 SPECIAL INSPECTION CERTIFICATE-2024-06-03_V1.PDF DOCUMENTS VIEW