Permit: TC-MDP-0524-00676
Permit Details
Apply Date:
06/03/2024
Applicant:
Daria Hopkins
Description:
SFR 230.1910 T21-M0029
Permit Reviews
Permit Number - TC-MDP-0524-00676
Permit Status: Issued
Permit Description: SFR 230.1910 T21-M0029
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/12/2024 | APPROVED |
06/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00676
Permit Status: Issued
Permit Description: SFR 230.1910 T21-M0029
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00676
Permit Status: Issued
Permit Description: SFR 230.1910 T21-M0029
Date | Description | Comments |
---|---|---|
06/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/04/2024 | Post-Tension Inspection Report is required. | |
05/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00676
Permite Description: SFR 230.1910 T21-M0029
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 7/18/24: missing hold downs |
07/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 7/18/24: missing hold downs |
11/15/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 11-15-24, paint/coat all exterior plastic, exterior patio light fixture missing, thermostat max height can be no higher than 54 inches Stopped inspection, additional items may be added. |
11/15/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 11-15-24, paint/coat all exterior plastic, exterior patio light fixture missing, thermostat max height can be no higher than 54 inches Stopped inspection, additional items may be added. |
11/15/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 11-15-24, paint/coat all exterior plastic, exterior patio light fixture missing, thermostat max height can be no higher than 54 inches Stopped inspection, additional items may be added. |
11/22/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 11-22-24, paint/coat all exterior plastic, no running water each lavatory, provide a taller ladder than 6 feet to access attic. |
11/15/2024 | ENGR Engineering Final | N/A | Not Ready | Grade on left side of home needs to be repaired. Sewer cap in driveway missing. Low voltage pedestal laying on the ground. DG piled in driveway. |
11/15/2024 | RSBU - Building Final | N/A | Re-inspection required | 11-15-24, paint/coat all exterior plastic, exterior patio light fixture missing, thermostat max height can be no higher than 54 inches Stopped inspection, additional items may be added. |
11/15/2024 | RSBU - Building Progress | N/A | Re-inspection required | 11-15-24, paint/coat all exterior plastic, exterior patio light fixture missing, thermostat max height can be no higher than 54 inches Stopped inspection, additional items may be added. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00676
Permit Description: SFR 230.1910 T21-M0029
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 7/9/2024 | |
07/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/9/2024 | |
07/11/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 7/11/2024 | |
07/18/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/18/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/19/2024 | COT - RSBU - Preslab | Passed | ||
07/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/01/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 8/1/2024 | |
08/01/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 8/1/2024 | |
09/05/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/5/2024 | |
09/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 9/5/2024 | |
09/05/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/28/2024 | COT - BULD - SWG Clearance | Passed | 10-28-24, SWG clearance inspection approved. | |
11/22/2024 | ENGR Engineering Final | Passed | CO Ready |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0524-00676
Status: Issued
Description: SFR 230.1910 T21-M0029
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/22/2024 | RSBU - Building Final | Scheduled | |
11/22/2024 | COT - RSEL - Outdoor Lighting | Scheduled | |
11/22/2024 | RSBU - Building Progress | Scheduled | |
11/22/2024 | COT - RSME - Mechanical Final | Scheduled | |
11/22/2024 | COT - RSEL - Electrical Final | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.