Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
06/10/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1460 T21-M0026

Permit Reviews

Permit Number - TC-MDP-0524-00672
Permit Status: Issued
Permit Description: SFR 130.1460 T21-M0026
Start Date Submittal Complete Date Status  
11/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/12/2024 APPROVED Review Details
06/11/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00672
Permit Status: Issued
Permit Description: SFR 130.1460 T21-M0026
Date Description Comments
06/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/18/2024 Post-Tension Inspection Report is required.
05/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0524-00672
Permit Description: SFR 130.1460 T21-M0026
Total Completed Inspections - 13
Date Description Inspector Results Comments
09/17/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 9/17/2024
09/18/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 9/18/2024
09/18/2024 COT - RSPL - Sewer Passed
09/24/2024 COT - RSBU - Preslab Passed
09/24/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/24/2024 COT - RSEL - Electrical Underground Passed
09/24/2024 COT - RSEL - Grounding/Bonding Passed
10/04/2024 COT - RSBU - Exterior Clips/Sheathing Passed
10/04/2024 COT - RSBU - Roof Nailing Passed
10/30/2024 BULD - Electrical Clearance Passed 10-30-24, electrical panel approved for power.
10/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10-30-24, intermediate inspection approved. Okay to continue with construction.
10/30/2024 COT - RSPL - Gas Pressure Test Passed 10-30-24, gas pressure test approved.
11/12/2024 COT - RSBU - Interior Shear Bracing Passed pass

Documents

File Name Document Type  
150364 PT LOT 65 COMPLETE-2024-11-07_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 65 PLOT PLAN_V1.PDF DOCUMENTS VIEW