Permit: TC-MDP-0524-00665
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
10080 S ARNOLD RANCH CT
Address NEW:
10080 S ARNOLD RANCH CT
Apply Date:
08/29/2024
Applicant:
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Permit Reviews
Permit Number - TC-MDP-0524-00665
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00665
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 09/12/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/12/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/12/2024 | Post-Tension Inspection Report is required. |
| 09/12/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00665
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
| Date | Description | Comments |
|---|---|---|
| 05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/12/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00665
Permite Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00665
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2024 | COT - RSPL - Rough Soil | Passed | 10/10/24 good to backfill. Shading required. | |
| 10/10/2024 | COT - RSPL - Sewer | Passed | 10/10/24 passed. | |
| 10/10/2024 | COT - RSPL - Yard Water Line | Passed | 10/10/24 passed. | |
| 10/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. | |
| 10/18/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. | |
| 10/18/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. | |
| 11/12/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-12-24, exterior clips/sheathing per approved plans. Okay to proceed with construction. | |
| 11/12/2024 | COT - RSBU - Roof Nailing | Passed | 11-12-24, roof nailing approved. | |
| 12/17/2024 | BULD - Electrical Clearance | Passed | 12/17/24 TEP clearance ECO. 12/17/24 pass | |
| 12/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/17/24 corrections have been made. | |
| 12/17/2024 | COT - RSEL - Grounding/Bonding | Passed | 12/17/24 pass | |
| 12/17/2024 | COT - RSPL - Gas Pressure Test | Passed | 12/17/24 pass | |
| 01/08/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 1/8/25 ok to tape | |
| 02/25/2025 | COT - BULD - SWG Clearance | Passed | 25 FEB 25 Southwest gas clearance: SWG. |
|
| 03/06/2025 | COT - RSEL - Electrical Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | COT - RSEL - Outdoor Lighting | Passed | 6 March 25 Pass |
|
| 03/06/2025 | COT - RSME - Mechanical Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | COT - RSPL - Plumbing Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/06/2025 | RSBU - Building Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | RSBU - Building Progress | Passed |