Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/30/2024
Applicant:
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.

Permit Reviews

Permit Number - TC-MDP-0524-00662
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Start Date Submittal Complete Date Status  
08/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/07/2024 APPROVED Review Details
09/19/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00662
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Activity Conditions - 6
Date Name
05/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/07/2024 Post-Tension Inspection Report is required.
08/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00662
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Date Description Comments
05/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00662
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/05/2024 COT - RSPL - Rough Soil Passed
09/05/2024 COT - RSPL - Sewer Passed
09/05/2024 COT - RSPL - Yard Water Line Passed
09/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed.
09/13/2024 COT - RSBU - Preslab Passed Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed.
09/13/2024 COT - RSEL - Electrical Underground Passed Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed.
10/02/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Interior and exterior plywood shear wall sheathing is properly installed and secured to studs, masa clips and shear wall hold downs are installed and secured to bottom plate. Cross braces are installed and secured to studs. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
10/02/2024 COT - RSBU - Roof Nailing Passed Roof sheathing and trusses are properly nailed down. Okay to proceed with rough-in of mechanical, electrical, and plumbing work.
11/06/2024 BULD - Electrical Clearance Passed ECO Clearance issued.
11/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed M, P, & E are complete per plan. Okay to proceed with drywall and insulation installation.
11/06/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi of air pressure with no leaks. Okay to proceed.
11/25/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly secured to studs per plan requirements for an interior shear wall. Okay to proceed with tape, texture, and paint.
11/26/2024 COT - RSEL - Grounding/Bonding Passed 11-26-24, bonding/grounding approved
01/21/2025 COT - BULD - SWG Clearance Passed 1-21-25, approved for Southwest gas to install meter. Clearance issued.
02/03/2025 COT - RSEL - Electrical Final Passed Passed final 2/3/25 clearance ECO
02/03/2025 COT - RSEL - Outdoor Lighting Passed Passed final 2/3/25
02/03/2025 COT - RSME - Mechanical Final Passed Passed final 2/3/25
02/03/2025 COT - RSPL - Plumbing Final Passed Passed final 2/3/25
02/03/2025 ENGR Engineering Final Passed CO Ready
02/03/2025 RSBU - Building Final Passed Passed final 2/3/25
02/03/2025 RSBU - Building Progress Passed Passed final 2/3/25

Documents

File Name Document Type  
1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
2_SITEPLAN_UPDATED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-07-30_V1.PDF DOCUMENTS VIEW