Permit: TC-MDP-0524-00662
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12740 E TORTOISE POINTE DR
Address NEW:
12740 E TORTOISE POINTE DR
Apply Date:
07/30/2024
Applicant:
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Permit Reviews
Permit Number - TC-MDP-0524-00662
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/07/2024 | APPROVED |
| 09/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00662
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 08/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/07/2024 | Post-Tension Inspection Report is required. |
| 08/07/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00662
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
| Date | Description | Comments |
|---|---|---|
| 05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00662
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision.
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/05/2024 | COT - RSPL - Sewer | Passed | ||
| 09/05/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed. | |
| 09/13/2024 | COT - RSBU - Preslab | Passed | Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed. | |
| 09/13/2024 | COT - RSEL - Electrical Underground | Passed | Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed. | |
| 10/02/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Interior and exterior plywood shear wall sheathing is properly installed and secured to studs, masa clips and shear wall hold downs are installed and secured to bottom plate. Cross braces are installed and secured to studs. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
| 10/02/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing and trusses are properly nailed down. Okay to proceed with rough-in of mechanical, electrical, and plumbing work. | |
| 11/06/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued. | |
| 11/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | M, P, & E are complete per plan. Okay to proceed with drywall and insulation installation. | |
| 11/06/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 psi of air pressure with no leaks. Okay to proceed. | |
| 11/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly secured to studs per plan requirements for an interior shear wall. Okay to proceed with tape, texture, and paint. | |
| 11/26/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-26-24, bonding/grounding approved | |
| 01/21/2025 | COT - BULD - SWG Clearance | Passed | 1-21-25, approved for Southwest gas to install meter. Clearance issued. | |
| 02/03/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/3/25 clearance ECO | |
| 02/03/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/3/25 | |
| 02/03/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/3/25 | |
| 02/03/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/3/25 | |
| 02/03/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 02/03/2025 | RSBU - Building Final | Passed | Passed final 2/3/25 | |
| 02/03/2025 | RSBU - Building Progress | Passed | Passed final 2/3/25 |