Permit: TC-MDP-0524-00661
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9617 E HARKES DR
Address NEW:
9617 E HARKES DR
Apply Date:
05/28/2024
Applicant:
Brianna Quiroz
Description:
Arches Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00661
Permit Status: Complete
Permit Description: Arches Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/07/2025 | APPROVED |
| 05/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/03/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00661
Permit Status: Complete
Permit Description: Arches Model Plan
| Date | Description | Comments |
|---|---|---|
| 06/07/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/03/2024 | Post-Tension Inspection Report is required. | |
| 05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00661
Permite Description: Arches Model Plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | Missing 2rsp clips on sw corner of house for the roof |
| 12/24/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | site does not use gas |
| 12/24/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00661
Permit Description: Arches Model Plan
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2024 | COT - RSPL - Backwater Valve | Passed | Under plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks. | |
| 09/11/2024 | COT - RSPL - Rough Soil | Passed | Under plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks. | |
| 09/11/2024 | COT - RSPL - Sewer | Passed | Under plumbing is installed and connected to main sewer line. Backwater valve is installed between two clean outs. Entire system is under a water test with no leaks. | |
| 09/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/18/2024 | COT - RSBU - Preslab | Passed | ||
| 09/18/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/18/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 10/04/2024 | COT - RSBU - Roof Nailing | Passed | passed-/4/24 | |
| 10/07/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/7/24: RSP Clips are installed. Okay to proceed with rough-in. | |
| 12/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/27/24 CORRECTIONS MADE | |
| 01/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/22/25 pass | |
| 04/11/2025 | BULD - Electrical Clearance | Passed | 11 April 25 TEP CLEARANCE:ECO |
|
| 05/19/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/19/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/19/2025 | ENGR Engineering Final | Passed | Site is in accordance with approved plans. | |
| 05/19/2025 | RSBU - Building Progress | Passed | ||
| 05/22/2025 | COT - RSEL - Electrical Final | Passed | Passed 5/22/25 corrections made | |
| 05/22/2025 | COT - RSME - Mechanical Final | Passed | Passed 5/22/25 corrections made | |
| 05/22/2025 | RSBU - Building Final | Passed | Passed 5/22/25 corrections made |