Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9580 E HARKES DR
Address NEW:
9580 E HARKES DR
Apply Date:
06/20/2024
Applicant:
Brianna Quiroz
Description:
Great Sand Dunes SFR Model Escalara

Permit Reviews

Permit Number - TC-MDP-0524-00659
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date Submittal Complete Date Status  
07/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/14/2025 APPROVED Review Details
06/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/24/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00659
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Date Description Comments
06/24/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/14/2025 Post-Installed Anchor Inspection Report is required.
06/24/2024 Post-Tension Inspection Report is required.
05/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00659
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/12/2025 COT - BULD - SWG Clearance N/A Not Applicable n/a
02/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled 2/12/25 canceled
12/12/2024 COT - RSPL - Yard Water Line N/A Re-inspection required 12-12-24, gauge not at 60psi.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00659
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 20
Date Description Inspector Results Comments
12/03/2024 COT - RSPL - Rough Soil Passed 12-3-24, underground plumbing verified as per approved plans.
12/03/2024 COT - RSPL - Sewer Passed 12-3-24, sewer connection verified as per approved plans.
12/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-12-24, excavation/rebar and setbacks verified per approved plans. Okay to pour concrete.
12/12/2024 COT - RSBU - Preslab Passed 12-12-24, preslab verified per approved plans. Okay to pour concrete.
12/12/2024 COT - RSEL - Electrical Underground Passed 12-12-24, electrical underground,excavation/rebar and setbacks verified per approved plans. Okay to pour concrete.
12/12/2024 COT - RSEL - Grounding/Bonding Passed 12-12-24, grounding/bonding,electrical underground,excavation/rebar and setbacks verified per approved plans. Okay to pour concrete.
12/31/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12/31/24 corrections made
12/31/2024 COT - RSBU - Roof Nailing Passed 12/31/24 corrections made
02/12/2025 BULD - Electrical Clearance Passed 2/12/25 approval for TEP ECO
02/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/20/2025 COT - RSBU - Interior Shear Bracing Passed 3-20-25, interior shear bracing approved. Okay for tape & texture.
07/29/2025 COT - RSEL - Outdoor Lighting Passed
07/29/2025 COT - RSPL - Gas Pressure Test Passed
07/29/2025 COT - RSPL - Yard Water Line Passed
07/29/2025 RSBU - Building Progress Passed
07/31/2025 COT - RSEL - Electrical Final Passed
07/31/2025 COT - RSME - Mechanical Final Passed
07/31/2025 COT - RSPL - Plumbing Final Passed
07/31/2025 ENGR Engineering Final Passed
07/31/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 36 SIC-2025-07-09_V1.PDF DOCUMENTS VIEW
USE - PATTISON SOILS REPORT 1.25.2022_V1.PDF DOCUMENTS VIEW
Z470 GREAT SAND DUNES- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 36 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 36 SIC-2024-06-20_V1.PDF DOCUMENTS VIEW