Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00659
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9580 E HARKES DR
Address NEW:
9580 E HARKES DR
Apply Date:
06/20/2024
Applicant:
Brianna Quiroz
Description:
Great Sand Dunes SFR Model Escalara
Permit Reviews
Permit Number - TC-MDP-0524-00659
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/14/2025 | APPROVED |
| 06/21/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/24/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00659
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/14/2025 | Post-Installed Anchor Inspection Report is required. | |
| 06/24/2024 | Post-Tension Inspection Report is required. | |
| 05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/24/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00659
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | n/a |
| 02/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | 2/12/25 canceled |
| 12/12/2024 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 12-12-24, gauge not at 60psi. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00659
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2024 | COT - RSPL - Rough Soil | Passed | 12-3-24, underground plumbing verified as per approved plans. | |
| 12/03/2024 | COT - RSPL - Sewer | Passed | 12-3-24, sewer connection verified as per approved plans. | |
| 12/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-12-24, excavation/rebar and setbacks verified per approved plans. Okay to pour concrete. | |
| 12/12/2024 | COT - RSBU - Preslab | Passed | 12-12-24, preslab verified per approved plans. Okay to pour concrete. | |
| 12/12/2024 | COT - RSEL - Electrical Underground | Passed | 12-12-24, electrical underground,excavation/rebar and setbacks verified per approved plans. Okay to pour concrete. | |
| 12/12/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-12-24, grounding/bonding,electrical underground,excavation/rebar and setbacks verified per approved plans. Okay to pour concrete. | |
| 12/31/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/31/24 corrections made | |
| 12/31/2024 | COT - RSBU - Roof Nailing | Passed | 12/31/24 corrections made | |
| 02/12/2025 | BULD - Electrical Clearance | Passed | 2/12/25 approval for TEP ECO | |
| 02/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/20/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-20-25, interior shear bracing approved. Okay for tape & texture. | |
| 07/29/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/29/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/29/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 07/29/2025 | RSBU - Building Progress | Passed | ||
| 07/31/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/31/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/31/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/31/2025 | ENGR Engineering Final | Passed | ||
| 07/31/2025 | RSBU - Building Final | Passed |