Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
9636 E HARKES DR
Address NEW:
9636 E HARKES DR
Apply Date:
05/28/2024
Applicant:
Brianna Quiroz
Description:
Great Sand Dunes SFR Model Escalara

Permit Reviews

Permit Number - TC-MDP-0524-00658
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date Submittal Complete Date Status  
04/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/14/2025 APPROVED Review Details
05/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/03/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00658
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Date Description Comments
06/03/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/03/2024 Post-Tension Inspection Report is required.
05/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/03/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00658
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/15/2024 COT - BULD - SWG Clearance N/A Not Applicable Not applicable
11/15/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not applicable
11/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 11-15-24, electrical schedule does not match with approved plans. Have Austin electric submit a letter and schematic of electrical layout. Submit to the city for review. Approval required before c of o can be issued.Okay to continue construction at own risk
11/15/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 11-15-24, roof nailing cannot be verified because roof has been loaded with tiles. Provide a letter stating nailing was done per approved plans.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00658
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 20
Date Description Inspector Results Comments
08/14/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading required. 8/14/2024
08/14/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 8/14/2024
08/14/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 8/14/2024
08/14/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 8/14/2024
08/29/2024 COT - RSEL - Electrical Underground Passed
08/29/2024 COT - RSEL - Grounding/Bonding Passed
08/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 8/30/24: Rebar reinforcement has been chaired off of ground. Corrections have been made to the rebar at garage footing. Okay to pour concrete for slab and footings.
08/30/2024 COT - RSBU - Preslab Passed 8/30/24: Rebar reinforcement has been chaired off of ground. Corrections have been made to the rebar at garage footing. Okay to pour concrete for slab and footings.
11/15/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-15-24, anchor bolts added to shear walls.
12/09/2024 BULD - Electrical Clearance Passed 12-9-24, panel okay to be energized. ECO clear issued to TEP.
01/03/2025 COT - RSBU - Interior Shear Bracing Passed Passed 1/3/25 ok to tape
04/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/21/25 letter received
04/21/2025 COT - RSBU - Roof Nailing Passed Verified roof was checked before loading, no letter needed
04/21/2025 COT - RSEL - Electrical Final Passed Passed final 4/21/25
04/21/2025 COT - RSEL - Outdoor Lighting Passed Passed final 4/21/25
04/21/2025 COT - RSME - Mechanical Final Passed Passed final 4/21/25
04/21/2025 COT - RSPL - Plumbing Final Passed Passed final 4/21/25
04/21/2025 ENGR Engineering Final Passed CO READY
04/21/2025 RSBU - Building Progress Passed Passed final 4/21/25
04/21/2025 RSBU - Building Final Passed Passed final 4/21/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 43 SIC-2025-03-28_V1.PDF DOCUMENTS VIEW
Z470 GREAT SAND DUNES- TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PHASE 1 LOT 43 PLOT PLAN_V1.PDF DOCUMENTS VIEW
PHASE 1A LOT 43 SIC-2024-05-28_V1.PDF DOCUMENTS VIEW