Permit: TC-MDP-0524-00658
Permit Details
Apply Date:
05/28/2024
Applicant:
Joshua Swinney
Description:
Great Sand Dunes SFR Model Escalara
Permit Reviews
Permit Number - TC-MDP-0524-00658
Permit Status: Issued
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00658
Permit Status: Issued
Permit Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/03/2024 | Post-Tension Inspection Report is required. |
06/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00658
Permit Status: Issued
Permit Description: Great Sand Dunes SFR Model Escalara
Date | Description | Comments |
---|---|---|
06/03/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00658
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not applicable |
11/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | 11-15-24, electrical schedule does not match with approved plans. Have Austin electric submit a letter and schematic of electrical layout. Submit to the city for review. Approval required before c of o can be issued.Okay to continue construction at own risk |
11/15/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 11-15-24, roof nailing cannot be verified because roof has been loaded with tiles. Provide a letter stating nailing was done per approved plans. |
11/15/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Not applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00658
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 8/14/2024 | |
08/14/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/14/2024 | |
08/14/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/14/2024 | |
08/14/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/14/2024 | |
08/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/30/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 8/30/24: Rebar reinforcement has been chaired off of ground. Corrections have been made to the rebar at garage footing. Okay to pour concrete for slab and footings. | |
08/30/2024 | COT - RSBU - Preslab | Passed | 8/30/24: Rebar reinforcement has been chaired off of ground. Corrections have been made to the rebar at garage footing. Okay to pour concrete for slab and footings. | |
11/15/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 11-15-24, anchor bolts added to shear walls. |